Eckerd's-LR 981211 G · GEOTECHNICAL ENGINEERING
E GEE Consultants,
Inc.
E ° CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: December 11, 1998 Date Concrete Placed: December 3, 1998 Standard 6"x12"
Cliem: NolTh American Properties-SW Area 28.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.: 4
Contractor: C.A. Walker Project No.: 298-0412
Concrete Supplier and Plant: TX! Plant/#41
Location of Placemem: Piers
MATERIALS so.,~,,, ssD..,:~, w,.,. INSPECTION DATA
D~cripfion CLbs,CuYd)
Mix Number: 47 Time Sample Batched: 09:30 am
Cement: 5.5 Sacks Time Sampled: 10:15 am
Fly Ash: Sample Location: B-6; M-6.1
Track/Ticket No: 805! 119352
Coarse Aggregate: Temperature:
Intermediate Aggregate: Ambiem Range: 72°F
Fine Aggregate: Concrete Range: ?8°F
Admixtures: Slump Range (inches): 4"
Weather Conditions: Cloudy
I Time Slatted: 06:00 am
2 Time Completed: 03:00 pm
Added Water: I0 Gallons Sample Air Content (%): N/A
Total Cubic Yards Placed: 10
Required Strength (Lbs./sq.in.): 4,000
Sl~-'cima'~ Meuumd Age Dale To~al Load Compresswe Strength Re~
ECK 13 7 12/10/98 118,760 4,200
ECK 14 28 12/31/98
ECK 15 28 12/31/98
ECK 16 H HOLD
T~t ~ ~a~ F~ R~ Cyl~e~ MMe By: HG
A~M ~31.C-39,C-143 ~U~s N~ O~i~)
Re~ ~/or D~6on:
cc: Mr. Johs-i Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
~ COII~{~i~{~, ~. ~an,'i~nmd by,. ' ~--'"'
All leuer,~ and repotla ate for d~e exclusive use o~ the client to whom they ate addressed and shall nm. be reproduced withuut ~he fu~l al~rovnl of GEE Co~ullants, Inc. The use of cur name must receive
our prim' wrinen approval Our leuet~ and repons apply only ~o ~he sample rested and/or inspected amd are nm rm;essatily indicative of the quanuties of nppamndy identical o~ similar products.