Loading...
Eckerd's-LR 981211 G · GEOTECHNICAL ENGINEERING E GEE Consultants, Inc. E ° CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REPORT OF CONCRETE MIX INSPECTION Report Date: December 11, 1998 Date Concrete Placed: December 3, 1998 Standard 6"x12" Cliem: NolTh American Properties-SW Area 28.27 Square Inches Project: Eckerds - Coppell Concrete Report No.: 4 Contractor: C.A. Walker Project No.: 298-0412 Concrete Supplier and Plant: TX! Plant/#41 Location of Placemem: Piers MATERIALS so.,~,,, ssD..,:~, w,.,. INSPECTION DATA D~cripfion CLbs,CuYd) Mix Number: 47 Time Sample Batched: 09:30 am Cement: 5.5 Sacks Time Sampled: 10:15 am Fly Ash: Sample Location: B-6; M-6.1 Track/Ticket No: 805! 119352 Coarse Aggregate: Temperature: Intermediate Aggregate: Ambiem Range: 72°F Fine Aggregate: Concrete Range: ?8°F Admixtures: Slump Range (inches): 4" Weather Conditions: Cloudy I Time Slatted: 06:00 am 2 Time Completed: 03:00 pm Added Water: I0 Gallons Sample Air Content (%): N/A Total Cubic Yards Placed: 10 Required Strength (Lbs./sq.in.): 4,000 Sl~-'cima'~ Meuumd Age Dale To~al Load Compresswe Strength Re~ ECK 13 7 12/10/98 118,760 4,200 ECK 14 28 12/31/98 ECK 15 28 12/31/98 ECK 16 H HOLD T~t ~ ~a~ F~ R~ Cyl~e~ MMe By: HG A~M ~31.C-39,C-143 ~U~s N~ O~i~) Re~ ~/or D~6on: cc: Mr. Johs-i Maggiore - North American Properties -SW Mr. Lance Lilly - Richmond Group Architecture & Planning Mr. Gary Stokes - C.A. Walker Construction Mr. Lee Stone - City of Coppell ~ COII~{~i~{~, ~. ~an,'i~nmd by,. ' ~--'"' All leuer,~ and repotla ate for d~e exclusive use o~ the client to whom they ate addressed and shall nm. be reproduced withuut ~he fu~l al~rovnl of GEE Co~ullants, Inc. The use of cur name must receive our prim' wrinen approval Our leuet~ and repons apply only ~o ~he sample rested and/or inspected amd are nm rm;essatily indicative of the quanuties of nppamndy identical o~ similar products.