Eckerd's-LR 981209 G o GEOTECHNICAL ENGINEI:,xING
E GEE Consultants,
Inc.
E · CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REPORT OF CONCRETE MIX INSPECTION
Report Date: December 9, 1998 Date Concrete Placed: December 1, 1998 Standard 6"x12"
Client: North American Properties-SW Area 28.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.: 2
Contractor: C.A. Walker Project No.: 298-0412
Concrete Supplier and Plant: TXI Plant//41
Location of Placement: Piers
MATERIALS S~r~, SSD S~h W.. INSPECTION DATA
I:~ ril~iO~ fLbs~CuYd)
M~ Numar: 47 Time Sample Ba~h~: 10:24 am
Cement: 5.5 Sacks Ti~ S~pl~: 11:10 am
Fly ~h: S~ple ~caUon: L-2.6; L~; C.7-1
Tmc~ieket No: 713/1191281
Coa~e Aggre~: 1" Tem~mmre:
In~iate Ag~: Ambient ~ge: 70*F
Fine Aggregam: Concrete ~ge: 75'F
Adm~mres: Slump ~ge (inch,): 3 ~"
Wea~er Condiaom: Clear
1 Ti~ S~: 07:00 am
2 Time CompleX: 04:00 pm
Add~ Wa~r: 13 Gallons Sample AR Conmnt (%): N/A
Total Cubic YaMs Place: 10
Requir~ S~n~ (Lbs./sq.in.): 4,000
Specimen Measured Age Date Total Load Compressive Stren$111 Rematics
Number Slum~ (in.) IDays) Tested (Lbs.) ILbs.;Sq.ln. )
ECK 5 7 12/08/98 96,280 3,400
ECK 6 28 12/29/98
ECK 7 28 12/29/98
ECK 8 H HOLD
T~t Me,nods Utilized Fracture Regular Cylinders Made By: HG
ASTM C-31.C.39.C. 143 {Unless Not~l Otherwise)
Remarks and/or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry Davis - City of Coppell ~.~ ~C!~
All leuers and rqx~s are f'oi' Ihe exclusive use of the client to whmn thr:y are add~ss~d and stuil no[ be reproduced withotu Ihe full qJpmval of GEE, Comulunts, Itl:. The use of our rdme must receive
our prior wri~l ~prov~l. Out leuers and i~or~s al~y only to d~e sample tested and/or nlspected and ar~ no~ neq~*ssarily indicative of th~ qualities of appa~flfly ide~ca] or similar produc[s.