Loading...
Enclaves-LR 950719 GBO- /-~ COA~ULTING ENGINEERS IN~ ~X~e Environmentat Assessments ~. So, is & Foundations Const~uctJon Hate~ats Testing ,,~ceLLe~e~rie~e" C~rciaL & l~striaL lns~ction ~Sox 92548 · Southlske, ;exas 76092 * (817) ~2~-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 07-19-95 DAY: Wednesday TIME: 2:00pm CLIENT: Wilbow Peck Corporation CONTRACTOR: Site Concrete RATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block A: 1. @ Lot 20 FG 2 19.7 104.5 96.1 2. @ Lot 18 FG 2 18.9 106.3 97.7 3. @ Lot 16 FG 2 20.2 107.3 98.7 4. @ Lot 14 FG 1 17.9 105.4 98.0 5. @ Lot 12 FG 1 19.1 103.9 96.6 6. @ Lot 10 FG 2 18.9 108.0 99.3 All tests passed. Minimum Compaction Required: 95% FG = Final Grade PROCTORS: 1. Tn & Brn Sandy Clay 107.5 PCF @ 16.6% MOISTURE 2. Tn & Brn Clay 108.7 PCF @ 18.4% MOISTURE Jeff Holden Technician