Loading...
ST0502A- LR151026G1 • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE ConsulA. tants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 + Fax (214) 352-6972 r i_ Report Date: Client: Project: Contractor: Concrete Supplier and Plant: Location of Placement: October 26, 2015 Date Concrete Placed: September 25, 2015 Standard 6"x12" Cylinders City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Bethel & Coppell Road Concrete Report No.: 25 Axis Project No.: 215-140 Txi Operations, Lp #141 Sidewalk MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Compressive Strength (Lbs./Sq.1n.) Remarks Description (Lbs/CuYd) 3 Mix Number: 8272 Time Sample Batched: 2:26 PM Cement: 5 Sack Time Sampled: 3:00 PM 83,980 2,970 Sample Location: W. Sidewalk at Int. Coppell and Fly Ash: 28 10/23/15 McNear Coarse Aggregate: Truck / Ticket No: 0000/1193 Intermediate Aggregate: 10/23/15 Temperature: 3,740 Fine Aggregate: BCR 115 Ambient Range: 95 OF H Concrete Range: 99 OF Admixtures: Fracture Regular Slump Range (inches): 5.5 1 Weather Conditions: Partly Cloudy 2 Time Started: 12:00 PM Time Completed: 4:15 PM Added Water: 0 Gallons n Sample Air Content (/o): 4.5 Total Cubic Yards Placed: 30 Required Strength (Lbs./sq.in.): 4,000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 111 3 9/28/15 83,320 2,950 BCR 112 7 10/2/15 83,980 2,970 BCR 113 5.5 28 10/23/15 120,800 4,270 BCR 114 28 10/23/15 105,740 3,740 BCR 115 H H Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: RodelK( ,coppelltx.l;ov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a),coppelltx.aov Mr. George Marshall - City of Coppell via Email: gmarshall(a),coppelltx.i ov Mr. Robert Caudill Tiseo Paving via Email: rcaudill(iDtiseopaving.com Inc. Firm: F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 0 Fax (214) 352-6972 Report Date: October 26, 2015 Date Concrete Placed: October 16, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 30 Contractor: Iowa Bridge & Culvert Lc. Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: E. Side Box Culvert, Bottom Slab MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 3:09 PM Date Tested Time Sampled: 3:45 PM Cement: Sample Location: Middle Section of Slab Fly Ash: Truck / Ticket No: 1417/63096194 Coarse Aggregate: Temperature: BCR 137 Intermediate Aggregate: Ambient Range: 80 OF OF 144,620 Concrete Range: 85 Fine Aggregate: Slump Range (inches): 4.0 Admixtures: Weather Conditions: Clear I Time Started: 8:45 AM 28 Time Completed: 4:30 PM 2 Sample Air Content (%): 3.5 Added Water: 0 Gallons Total Cubic Yards Placed: 47.5 Re uired Stren h Lbs./s .in.: 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 136 3 10119/15 142,940 5,060 BCR 137 7 10/23/15 144,620 5,120 BCR 138 4.0 28 11/13/15 BCR 139 28 11/13/15 BCR 140 H H Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a7coopelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunasAcoppelltx.>;ov Mr. George Marshall - City of Coppell via Email: gmarshallAcoppelltx.aov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a)tiseopaving.corn Firm: Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E ( • ENVIRONMENTAL CONSULTING i • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report Date: October 26, 2015 Date Concrete Placed: October 20, 2015 Standard 6"x12" Cylinders Client: City Of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 32 Contractor: Iowa Bridge & Culvert Lc. Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: E. Side Box Culvert Walls MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 2:54 PM Cement: Time Sampled: 3:30 PM Remarks Sample Location: Southern Most Wall FI Ash: Fly Truck / Ticket No: 7060/63096263 Coarse Aggregate: Temperature: BCR 147 Intermediate Aggregate: Ambient Range: 75 OF Concrete Range: 90 OF Fine Aggregate: Slump Range (inches): 3.0 Admixtures: Weather Conditions: Clear 1 Time Started: 11:30 AM 28 Time Completed: 4:45 PM 2 Sample Air Content (%): NIA Added Water: 0 Gallons Total Cubic Yards Placed: 19.0 Reauired Strenath (Lbs./sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 146 3 10/23/15 147,760 5,230 BCR 147 7 10/27/15 BCR 148 3.0 28 11/17/15 BCR 149 28 11/17/15 BCR 150 H 1 11 Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a,conyelltx.l~ov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a),coppelltx.cov Mr. George Marshall - City of Coppell via Email: gmarshallna,coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudiIKDtiseopavina.com GEE Consultants, Inc. F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 * Fax (214) 352-6972 Report Date: October 26, 2015 Date Concrete Placed: October 21, 2015 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 33 Contractor: Iowa Bridge & Culvert Lc. Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: Box Culvert Walls MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1701 Time Sample Batched: 2:45 PM Cement: Time Sampled: 3:15 PM Remarks Sample Location: 2 nd Wall From N. End of Culvert Fly Ash: Truck / Ticket No: 3035/63096313 Coarse Aggregate: Temperature: BCR 152 Intermediate Aggregate: Ambient Range: 72 OF Fine Aggregate: Concrete Range: 91 OF BCR 153 Slump Range (inches): 4.5 Admixtures: Weather Conditions: Clear 1 Time Started: 1:00 PM 2 Time Completed: 4:30 PM Sample Air Content (%): N/A Added Water: 0 Gallons Total Cubic Yards Placed: 6.5 Required Strength (Lbs./sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.In.) Remarks BCR 151 5 10/26/15 136,340 4,820 BCR 152 7 10/28/15 BCR 153 4.5 28 11/18/15 BCR 154 28 11/18/15 BCR 155 H H Test Methods Utilized Fracture Regular Cylinders Made By: BT ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell a,copnelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas cr,coyyelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshallAcoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillAtiseopaving.com Inc. 12 Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.