Loading...
WA9302A-CS 951206 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. IACOBS, P.E. JAh4~S E. LAUGhLiN, P.E. W j~¢~"'~O'~. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. December 6, 1995 C. L. SHIMEK, P.E. I. C. FINKLEA, P.E. Mr. Howard P ord Water Utili ' s Superintendent Ci~ of ppell Post rice Box 478 Co ell, Texas 75019 p Station Addition ~RCC Review Submi~al Dear Mr. Palford: We are enclosing ~o sets of final plans and specifications for the construction of the Village Parkway Pump Station Addition. These sets are for your use in submi~ing to the Texas Natural Resource and Consedation Commission (~RCC) for their review. We are also enclosing a dra~ leRer for your use in transmi~ing the plans and specifications to the ~RCC. It is our interpretation of Chapter 290, Rules and Regulmions for Public Water Systems, adopted in 1992, that an engineering repo~ is to accompany the submission of the project plans and specifications. It seems the recently prepared repoa on the Ci~'s water distribmion system, along with our design le~er dated June 12, 1995, would meet that requirement. If the enclosed plans ~d specifications meet with your approval, please fo~d ~o sets along with the Ci~'s water system master plan repoa and the enclosed copy of our June 12, 1995 le~er to: Plans Review Water Utilities Division Texas Natural Resource Consedation Commission Post Office. Box 13087 Austin, Texas 78711-3087 We are available to discuss this project fu~her at your convenience. 1~ Gary C. Hendricks, P.E. en Griffin, P.E. - " DRAFT LETTER Mr. David Laughlin, P.E. Plans Review Water Utilities Division Texas Natural Resource Conservation Commission Post Office. Box 13087 Austin, Texas 78711-3087 Re: City of Coppell, Texas Village Parkway Pump Station Addition Dear Mr. Laughlin: In accordance with the requirements of Chapter 290.39, Rules and Regulations for Public Water Systems, we are submitting for your review two sets of plans and specifications for the construction of the Village Parkway Pump Station Addition. We are also enclosing one copy of the City of Coppell, Water System Master Plan Report, and a design letter report dated June 12, 1995 for you reference. Please review the plans and specifications and indicate any revisions or corrections required. It is our intention to publicly advertise this project receive and open bids December 2 I, 1995. You timely review of this submittal is greatly appreciated. If you have any technical questions concerning the plans and specifications, please feel free to contact our project design engineers directly as follows: Gary C. Hendricks, P.E. Shimek, Jacobs and Finklea Consulting Engineers 8333 Douglas Ave., Suite 820 Dallas, Texas 75225 (214) 361-7900 If you have any other questions or need additional information, please feel free to contact me. Sincerely yours, Howard Pafford Water Utilities Superintendent City of Coppell Enclosures