ST9801-CS010725JUL-25-2001 11:23 FN! DALLAS P.02 NICHOLS MEMORANDUM TO: Larry Davis FROM: Scott Maughn ~c~ SUBJECT: Coppell Rd. Pay Estimate gl8 DATE: July 25, 2001 I have looked over the latest Pay Estimate from Ed Bell Construction Co. and compared it to the last estimate I received, which was Pay Estimate #13. !I am concerned that I never received any Pay Estimate # 14, 15, 16, or 17. However, I did discuss this with you on the phone, and you haven't received any of those estimates either. This may be an issue that needs to be brought to Ed Bell's attention and clarified by them. After reviewing the charges in the estimate, I found 4 igems that are overages on their quantities. Item #18, 22, 25, a~d 32 were all over the bid quantities for the project. I think these quantities caa be verified by you fairly quickly, and can be adjusted if necessary. Although these 4 items are over the original bid quaatities, thc total dollar overage for all 4 is only $7983.20. It seems that the overage for Item g25 is due to the substitution bf Item #24, which has not been charged for on the project. The large overage on the 4" Yellow Reflection Traffic Buttons (Item #32) is a concern, and I would like you to verify this overage. Ed Bell exceeded the bid quantity by 712 buttons, which makes me wonder how they almost tripled the original quantity. Please check these Items and verify that the overages axe legitimate. I also checked on the Mansion's driveway increase request that I received from Ed Bell. After reviewing some older plans and comparing them to thd most rex:ent ones, I determined that EBbs estimate of 14.21% is fairly accurate, and I do not hav~ a problem with the amount they requested. This is a reasonable increase on that item. Thanks, and call if you have any questions. TOTAL P.02