Loading...
WA9302A-CS 951218~i~;~k. ~n~ obs ~ ~-il'lklea TO: C3ty of Coppell at: Engineering Dept.F~: 351-0204 Voice: 351-7900 Page 1 of 1 Mond~, December ~8. ~995 11:09:52 CITY OF COPPELL VILLAGE PARKWAY PUMP STATION ADDITIONS ADDENDUM NO. 2 December 18, 1995 The plans and specifications for the construction of the City of Coppell, Texas, Village Parkway Pump Station Additions Project, for which bids are to be received until 2:00 p.m., December 21, 1995, are hereby modified as follows: 1. Refer to construction plan sheet C7 - Butterfly Valve Detail. This detail is not required for the construction of this project. There are no butterfly valves included in the scope of work. 2. Refer to construction plan sheet C8 & C9 - Injection Vault Details. Delete the roof scuttle and the 4-inch high concrete curb shown. Refer to structural construction plan sheet S4 for access hatch details and specifications. 3. Refer to SC. 31 Valves of the specifications. Revise this section to include the Willamette Cone Valve manufactured by the Portland Water Valve Co. of Gresham, Oregon as an approved equal. 4. Bidders shall acknowledge receipt of Addendure No. 2 in the space provided in the Proposal and o__n the outer envelope of their bid. Shimek, Jacobs & Finklea Consulting Engineers Dallas, Texas