Loading...
ST9801-CR010725' DAILY CONSTRUCTION REPORT PRO. FECT COPPELL ROAD DATE 7' ~? >~'~~l REPORT# (Sandy Lake Rd. to SH 121) .~ PROJECTNO. ST 98-01 DAY [M IT I~g~'~ T IF IS IS I OWNER CITY of COPPELL WEna~XR SUN ~ ~9VERCAST RAIN SSOW TEMP To 32 32-$0 50-70 7085 ~ un , , CONTRACTOR ED BELL CONSTRUCTION CO. Wl~ Still ~ m~a Report No hm'MmrrY Ory Moa ~ ~ PROJECT INSPECTOR LARRY DAVIS AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL RFaMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: SIGNATURE PUBLIC WORKS INSPECTOR Page __ of __ pages.