ST9801-CR010725' DAILY CONSTRUCTION REPORT
PRO. FECT COPPELL ROAD DATE 7' ~? >~'~~l REPORT#
(Sandy Lake Rd. to SH 121) .~
PROJECTNO. ST 98-01 DAY [M IT I~g~'~ T IF IS IS I
OWNER CITY of COPPELL WEna~XR SUN ~ ~9VERCAST RAIN SSOW
TEMP To 32 32-$0 50-70 7085 ~ un , ,
CONTRACTOR ED BELL CONSTRUCTION CO. Wl~ Still ~ m~a Report No
hm'MmrrY Ory Moa ~ ~
PROJECT INSPECTOR LARRY DAVIS
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL RFaMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
SIGNATURE
PUBLIC WORKS INSPECTOR
Page __ of __ pages.