Loading...
Denton Tap L2R BA-LR010330FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Preston Engineering Report Date: March 30, 2001 PROJECT: Everybody Fits, Coppell, Texas Project No.: 0701-2035 SAMPLE DATE: March 21, 2001 CONTRACTOR: Preston Engineering TICKET NO.: 94956 CONCRETE SUPPLIER: Nelson Brothers AMBIENT TEMP. (CF): 77 PLANT/TRUCK: 216 CONCRETE TEMP. (°F) (ASTM C-1064).' 67 MIX ID NUMBER: TIME BATCHED: 3:30 pm AIR (%) (ASTM C-231): TIME SAMPLED: 4:00 pm WATER ADDED (gal): 0 WEATHER CONDITION: Sunny SLUMP (in.) (ASTM C.143): 9 LOCATION OF PLACEMENT: Grade beams and walls at main entrance in east side of building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) EFC 24 7 03/28/01 39700 1400' 3000/28 days EFC 25 28 04/18/01 EFC 26 28 04/18/01 EFC 27 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Ty~esof ,~ [~ ~/--"'~ ['--] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Possible Iow 28 days compressive concrete strength results based on 7 day test result. Technician: Dumitru Balas FUGRO SOUTH INC. Reviewed By: '~ (/ SMH/rm Distribution: Preston Engineering - Timothy D. McMahon, P.E. City of Coppell - Lee Stone