WA9302A-CS 951205 SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS
8333 Douglas Avenue,//820 Dallas, Texas 75225 (214) 361-7900
Ross L. ACOBS, 02.-
RONALD V. CONWAY, P.E. 3
JOHN W. BIRKHOFF, P.E.
JOE R. CARTER, P.E.
GARY C. HENDRICKS, P.E.
December 5, 1995
C. L. SHIMEK, P.E.
I. C. FINKLEA, P.E,
JAMES E. LAUGHLIN, P.E.
Mr. Howard Paf d
Water Utilitie uperintendent
City of Co ell
Post Of~ e Box 478
Pump Station Addition
Final Plans and Specifications
Dear Mr. Pafford:
We are enclosing two sets of final plans and specifications for the Village Parkway Pump Station Addition
Project. These sets have been revised in accordance with the City's review mark-ups which we are returning
with this submittal.
We understand the City advertised this project for bids in the local newspaper on Friday, December 1, 1995
and will advertise again on Friday, December 8th. As we discussed, we have sent notices to publishers,
suppliers and contractors who typically perform work of this nature. We are enclosing a list of those
companies we notified.
As you requested, we have re-evaluated our opinion of probable construction cost for this project. Our
updated opinion is based on the final plans and includes the replacing the roofing on the existing pump station,
relocation of the existing electric duct bank out from under the proposed expansion, the addition of the radio
our opinion of probable construction cost Br your review along with our previous opinion dated December,
1994.
We are available to discuss this project further at your convenience.
S i n2e ~~~
Enclosures
lfe( Mr. Ken Griffin, P.E.
'~ ? SHll~K, ~ACOBS & FINKLEA
CITY OF COPPELL, TEXAS
VILLAGE PARKWAY PUMP STATION
EXPANSION
List of Publishers/Suppliers in which Notice to Contractors was sent
Bid Opening Date, December 21, 1995, 2:00 p.m.
1. Associated General Contractors 9. Oslin Nation Company
6220 N. Belt Line, Suite 250 2532 Irving Blvd.
Irving, Texas 75063 Dallas, Texas 75207
2. AGC - Dallas Plan Room 10. R J Environmental
11111 Stemmons Freemy 6197 Cornerstone Ct. East, Suite 108
Dallas, Texas 75229 San Diego, CA 92 12 1
3. Construction Data Corporation 11. Sepco Industries
11940 JoHyville Road, Suite 305-S P.O. Box 565 105
Austin, Texas 78759 Dallas, Texas 75356-5 105
4. Dodge Reports 12. Smith Pump Company
8828 Stemmons Frwy., Suite 550 7437 Tower Street
Dallas, Texas 75247 Fort Worth, Texas 76118
5. Environmental Improvements, Inc. 13. Texas ComractoB
P.O. Box 915 25 10 National Drive
Lewisville, Texas 75067 Garland, Texas 75041
6. Mgtro-Quip 14. Water and Waste Management Associates
2312 Michigan Court 2550 Midway Road, Suite 230
Arlington, Texas 76016-5870 Carrollton, Texas 75006
7. Mid-Tex Controls, Inc. 15. Welch-Southwest &Burnham
P.O. Box 584 P.O. Box 966
Lewisville, Texas 75067 Emory, Texas 75440
8. Municipal Valve &Equip. Co., Inc. 16. Whitley & Sicktons
4100 Spdng Valley Road P.O. Box 821773
Dallas, Texas 75244 Dallas, Texas 75382
Page I
" "T' SH]]VlEK, JACOBS & FINKLEA
CITY OF COPPELL, TEXAS
VILLAGE PARKWAY PUMP STATION
EXPANSION
List of Contractors in which Notice to Contractors was sent
Bid Opening Date, December 21, 1995, 2:00 p.m.
1. Acme Electric Company 8. John Bums Construction Company
4703 Martin Street 6316 Toronto Street
Fort Worth, Texas 76119 Dallas, Texas 75212
2. Andreola Restoration, Inc. 9. Cajun Contractors, he.
3606 Dividend Post Office Box 59367
Garland, Texas 75042 Dallas, Texas 75229
3. Architectural Utilities, he. 10. B.I. Clement Electric Company
P.O. Box 11586 P.O. Box 368
Fort Worth, Texas 76112 Wylie, Texas 75098
4. Archer-Western Company 11. Comet Steel, Inc.
1170 W. Corporate Drive 4846 Singleton Blvd.
Arlington, Texas 76006 Dallas, Texas 75212
5. Automation Concepts, Inc. 12. Coppert Construction Company, Inc.
3517 Asset Street P.O. Box 1139
Garland, Texas 75042 Lewisville, Texas 75067
6. Bar Constructors 13. Craig, Sheffield &Austin, Ine.
P.O. Box 10 2650 Sams School Road
Lancaster, Texas 75 146 Roanoke, Texas 76262
7. Barson Utilities, Inc. 14. Dake Construction Company
2018 W. Kitty Hawk Drive - 2929 Delaware Trail
Alien, Texas 75002 Fort Worth, Texas 76 135
Page I
~ ~ SHIMEK, JACOBS & FINKI.FA
CITY OF COPPELL, TEXAS
VILLAGE PARKWAY PUMP STATION
EXPANSION
List of Contractors in which Notic~ to Contractors was sent
Bid Opening Date, Dec~nber 21, 1995, 2:00 p.m.
15. Eagle Contracting Corporation 22. Iowa Bridge &Culvert
Post Offic~ Box 1600 P.O. Box 865149
Keller, Texas 76244 PIano, Texas 75023
16. Martin K. Eby Constr. Co., Inc. 23. Jay-Mar Corporation
P.O. Box 18337 9080 Highway 121
Fort Worth, Texas 76118 Denton, Texas 76205
17. I.C. Evans 24. Jersey Equipment Company
3900 Valley View Lane 217 S. Stemmons Expwy.,//204
Irving, Tgxas 75062 Lewisville, Texas 75067
18. C_nac, on Construction Company, Inc. 25. LEM Construction Company, Inc.
P.O. Box 360039 Rout~ 8, Box 129-D
Dallas, Texas 75336-.0039 New Bratmfds, Texas 78130
19. W.R. Hodgson & Co., Inc. 26. Lindgr-Stahl Construction Co., Inc.
107 E. Malloy Bridge Road 2200 Cantrell-Sansom Rd.
Seagoville, Texas 75 159 Fort Worth, Texas 76131
20. Mike Holt Electric Inc. 27. North Texas Municipal Construction Co.
4416 McLean 5614 Dyer Street
Fort Worth, Texas 76117 Dallas, Texas 75206
21. H & S Utilities, Inc. 28. Psencik Construction Company
P.O. Box 40880 P.O. Box 3207
Evennan, Texas 76140 Temple, Texas 76502
Page 2
_.. ~ SHIMEK, JACOBS & FINKLEA
CITY OF COPPELL, TEXAS
VILLAGE PARKWAY PUMP STATION
EXPANSION
List of Contractors in which Notice to Contractors was sent
Bid Opening Date, December 21, 1995, 2:00 p.m.
29. C.D. Pugsley, Inc. 36. Texsun Electrical Contractors, Inc.
5050 Quorum Dr., Suite 700 P.O. Box 15573
Dallas, Texas 75240 Fort Worth, Texas 76119
30. Red River Construction Company, Inc. 37. Watkjn and Company
13725 Omega Road P.O. Box 29929
Dallas, Texas 75244 Dallas, Texas 75229
31. Oscar Renda Contracting 38. Welch-Southwest &Burnham
#7 Benson Lane P.O. Box 966
Roanoke, Texas 76262 Emory, Texas 75440
32. River Valley Enterprises 39. WHF Electrical Contractor
P.O. Box 997 Post Office Box 1899
Rockwall, Texas 75087 PIano, Texas 75074-1899
33. SCAVA Ltd. Partnership 40. Young Brothers Cont., Inc.
P.O. Box 270249 P.O. Drawer 1800
Dallas, Tc~as 75227-0249 Waco, Texas 76703
34. Ben Sira & Company
Hwy. 174 N. E. Avenue "F"
Meridian, Tcxa.s 76665
35. Taylor Electrical Services, Inc.
7501 U.S. Hwy. 287, Ste. E-2
Arlington, Texas 76017
Page
' SHIMEK, JACOBS & FINKI~EA 4T ProjectNo. 94156
CONSULTING ENGINEERS
Client: City of Coppell, Texas Page No.
Project: Village Parkway Pump Station Expansion Date: December 4, 1995
Based on Final Construction Plans and Specifications By: Gary Hendricks, P.E.
ENGINEER'S OPINION OF CONSTRUCTION COST
Item No. IDescription ~QuantityI Unit I Price I Amount
I 31'-4" x 22'-9" Building Addition (includes HAV) 713 1 $90.00 $64,155.00
2 18-inch Foundation Piers (nominal 30-foot depth) 9 Ea. $1,200.00 $10,800.00
3 Pavement Removal 119 S.Y. $10.00 $1,192.04
4 New 6-inch Reinf. Conc. Pvmt 455 S.Y. $40.00 $18,200.00
5 Remove Existing Concrete Curb 40 L.F. $2.00 $80.00
6 6-inch Concrete Curb and Gutter 32 L.F. $6.00 $192.00
7 48" x 16" Tapping Sleeve and Valve 2 Ea. $12,000.00 $24,000.00
8 36" x 12" Tapping Sleeve and Valve 2 Ea. $10,500.00 $21,000.00
9 Pump Station Piping
16" D.I.P, Class 51 50 L.F. $425.00 $21,250.00
12" D.I.P., Class 51 32 L.F. $400.00 $12,800.00
16" 90 d bends 4 Ea $600.00 $2,400.00
16" Wall Sleeves 2 Ea $900.00 $1,800.00
16" x 12" D.I.P. Reducers 2 Ea $397.50 $795.00
16" Thrust Harness 2 Ea $1,200.00 $2,400.00
8" x 12" D.I.P. Reducer 2 Ea $165.00 $330.00
12" 90 d Bend 4 Ea $360.00 $1,440.00
12" Thrust Harness 2 Ea $850.00 $1,700.00
10 8" Pump Control Cone Valve 2 Ea. $20,000.00 $40,000.00
11 Worthington 250 Hp Pump 2 Ea. $30,000.00 $60,000.00
12 Electrical
Emergency Generator Connection
208 V Transformer Modifications
480 V MCC for 2 New Pumps
Conduits/Cables/etc.
Instrumentation Modifications
Computer control and Installation 1 L.S. $275,000.00 $275,000.00
'SHIMEK, JACOBS & FINIxt~EA ProjectNo. 94156
CONSULTING ENGINEERS
Client: City of Coppell, Texas Page No. i o~'~
Project: Village Parkway Pump Station Expansion Date: December 4, 1995
Based on Final Construction Plans and Specifications By: Gary Hendricks, P.E.
ENGINEER'S OPINION OF CONSTRUCTION COST
Item No. IOescription I Quantity I Unit I Price I Amount
13 Relocate 4160 V Duct Bank 1 L.S. $10,000.00 $10,000.00
14 4-inch PVC Drain Pipe 210 L.F. $10.00 $2,100.00
15 Sanitary Sewer Clean-outs 2 Ea. $300.00 $600.00
16 Fence Repairs (Including repainting and Landscaping) 210 L.F. $25,00 $5,250.00
17 Replace existing Roofing 1 L,S. $10,000.00 $10,000.00
Pump Station Expansion Subtotal: $587,484.04
18 Dinsinfection Facilities:
Pre-packaged chlorine facility including scrubber 1 L.S. $112,500.00 $112,500.00
Pre-packaged ammonia facility including scrubber 1 L.S. $97,500.00 $97,500.00
Chloramine analyzers 2 Ea. $2,000.00 $4,000.00
Flow proportion controllers (cl2 and nh3) 2 Ea. $2,500.00 $5,000.00
Gas Detector (CL2 or NH3) 2 Ea. $3,500.00 $7,000.00
2-inch PVC Solution Piping 1,050 L.F. $6.00 $6,300.00
3-inch PVC Piping 80 L.F. $9.00 $720.00
16: x 3" Tapping Sleeve and Valve 1 Ea. $3,000.00 $3,000.00
Elevated Storage Site Analyzer 1 Ea. $3,000.00 $3,000.00
DWU INjection Vault 1 Ea. $5,500.00 $5,500.00
Coppell Injection Vault 1 Ea. $3,500.00 $3,500.00
Yard piping. electrical, injectors, misc. 1 L.S. $7,000.00 $7,000.00
8-foot Brick Screening Wall 450 S.F. $10.00 $4,500.00
1-inch flow control Valves (seleniod type) 6 Ea. $500.00 $3,000.00
NEMA 4 Valve Control Cabinet I L.S. $5,000.00 $5,000.00
Dinsinfection Subtotal: i $255,020.00
Project Subtotal: $842,504.04
Contingencies @ 2% $16,900.00
Project Total: $859,404.04
USE: $860,000.00
EXHIBIT "F"
SHIMEK, JACOBS & FINKLEA ProjectNo. 94156
CONSULTING ENGINEERS
Client: City of Coppell, Texas Page No. i or l
Project: Village Parkway Pump Station Expansion Date: December 1, 1994
Budget Estimate Based on Conceptual Layout By: Gary Henddcks
ENGINEER'S OPINION OF CONSTRUCTION COST
Item No. I Description ] Quantityt Unit ~ Price ] Amount
I 48" x 16" Tapping Sleeve and Valve 2 Ea. $8,000.00 $16,000.00
2 36" x 16" Tapping Sleeve and Valve 2 Ea. $7,000.00 $14,000.00
3 Piping
16" Steel Piping 40 L.F. $400.00 $16,000.00
24" Steel Piping 32 L.F. $450.00 $14,400.00
4 8" Pump Control Valve 2 Ea. $8,000.00 $16,000.00
5 Worthington 250 Hp Pump 2 Ea. $37,000.00 $74,000.00
6 Pavement Removal 70 S.Y. $10.00 $700.00
7 Pavement Replacement 70 S.Y. $50.00 $3,500.00
8 Electrical
Emergency Generator Connection
208 V Transformer Modifications
480 V MCC for 2 New Pumps
Conduits/Cables/etc.
Instrumentation Modifications
Computer Control and Installation I LS. $245,000.00 $245,000.00
9 25' x 30' Building Addition (includes HAV) 750 S.F. $85.00 $63,750.00
Pump Station Expansion Subtotal: $463,350.00
10 Dinsinfection Facilities:
Pre-Packaged Chlorine Facility including Scrubber 1 L.S. $75,000.00 $75,000.00
Pre-Packaged Ammonia Facility including Scrubber 1 L.S. $65,000.00 $65,000.00
Chloramine Analyzers 4 Ea. $2,000.00 $8,000.00!
Flow Proportion Controllers (CL2 and NH3) 2 Ea. $2,500.00 $5,000.00!
Gas Detector (CL2 and NH3) I Ea. $4,500.00 $4,500.00
Romote Analyzer Sites (Vault, SCAD. A,, Power,etc.) 2 Ea. $7,000.00! $14,000.00
Yard Piping, Electrical, Injectors, Misc. I L.S. $7,000.00! $7,000.00
DinsInfection Subtotal: $178,500.00
Project Subtotal: $641,850.00
Contingencies @ 5% $32,100.00
PROJECT TOTAL: $673,950.00
USE: $675t000.00