Loading...
ST0004-LR010726 (3)~ GEOT. rr. CHNICAL, ENVIRONMENTAL AND MATERIALS EI, U~NEERS DA ~ FORT WORTH HOUSTON AUSTIN LC ~/IEW 11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080 _--- ~- - Concrete Compression Test Report Client: The City of Coppell Report Distribution: (1) The City of Coppell Project: Freeport Parkway Pavement Repair TMI Report No.: DC01-066-024 Report Date: 07/26/2001 Specifications Test Data Strength 4000 psi @ 28 Days Placement Date 07/19/2001 Slump 5 in max Sampled By Zuhair Shubbar Air Content 3 % rain 6 % max Weather Clear Concrete Temperature n/a Supplier/Mix Hanson/9636 Ambient Temperature n/a Air Content Method ASTM C-231-B Ticket Number: 866761 Time Batched: 1:00 pm Time Sampled: 1:54 pm Slump: 5.25 in* Air Content: 6.0 % Unit Weight: n/a Concrete Temperature: 96° F Ambient Temperature: 97° F Yardage (c.y.): n/a Placement Location: Paving Sample Location: Station 7+00, North bound lane of Freeport Parkway An asterisk (*) appears next to field data which does NOT meet specifications. Age. Max Load Area Strength Fracture Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psi} Type 1 07190101 07/26/2001 7 106890 28.27 3780 unbonded cap 1 07190102 07/26/2001 7 108440 28.27 3830 unbonded cap 1 07190103 08/02/2001 14 1 07190104 08/02/2001 14 I 07190105 08/16/2001 28 1 07190106 08/16/2001 28 Normal cylinder size: 6" x 12" Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172. C1064, and C617 or C12.~. Supervisor was informed of high concrete temperature. TERRA-MAR, INC. lhe results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. ^ny reproduction this report, or any part therein, is strictly prohibited without the express written consent of TMI. Page 1 of 2