ST0004-LR010726 (3)~ GEOT. rr. CHNICAL, ENVIRONMENTAL AND MATERIALS EI, U~NEERS
DA ~ FORT WORTH HOUSTON AUSTIN LC ~/IEW
11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080
_--- ~- - Concrete Compression Test Report
Client: The City of Coppell Report Distribution: (1) The City of Coppell
Project: Freeport Parkway Pavement
Repair
TMI Report No.: DC01-066-024
Report Date: 07/26/2001
Specifications Test Data
Strength 4000 psi @ 28 Days Placement Date 07/19/2001
Slump 5 in max Sampled By Zuhair Shubbar
Air Content 3 % rain 6 % max Weather Clear
Concrete Temperature n/a Supplier/Mix Hanson/9636
Ambient Temperature n/a Air Content Method ASTM C-231-B
Ticket Number: 866761 Time Batched: 1:00 pm Time Sampled: 1:54 pm
Slump: 5.25 in* Air Content: 6.0 % Unit Weight: n/a
Concrete Temperature: 96° F Ambient Temperature: 97° F Yardage (c.y.): n/a
Placement Location: Paving
Sample Location: Station 7+00, North bound lane of Freeport Parkway
An asterisk (*) appears next to field data which does NOT meet specifications.
Age. Max Load Area Strength Fracture
Set # Cyl~der Test Date (days) (lbs. force) (sq.in.) (psi} Type
1 07190101 07/26/2001 7 106890 28.27 3780 unbonded cap
1 07190102 07/26/2001 7 108440 28.27 3830 unbonded cap
1 07190103 08/02/2001 14
1 07190104 08/02/2001 14
I 07190105 08/16/2001 28
1 07190106 08/16/2001 28
Normal cylinder size: 6" x 12"
Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172. C1064, and C617 or C12.~.
Supervisor was informed of high concrete temperature.
TERRA-MAR, INC.
lhe results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. ^ny reproduction
this report, or any part therein, is strictly prohibited without the express written consent of TMI.
Page 1 of 2