Loading...
Old Town CoppellKeith, The lots at Travis and South Coppell are complete and ready for certification by the developer. These lots will be cordoned off with orange safety fence to help eliminate anyone from getting in there and disturbing these grades but they need to be reviewed and accepted by the developer this week if possible. Our meter cans and cleanout adjustments will be completed this week by KCK, franchise utility tie ins will be completed this week by Housley, and site lighting conduit and bases will be complete this week by Mel's as well. JRJ Paving, LP 1805 Royal Lane, Ste. 107 Dallas, TX. 75229 214-466-8340