Denton Tap L2R BA-LR 980910 MECHANICAL
ALPHA TESTING, INC.
STABILIZATION / MODIFICATION
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 FITN^ I. M IX
972/620-8911 - 972/263-4937 (Metro)
FAX: 972,/406-&q23
TESTED FOR: SUPERIOR BUILT DAI E: 09/10/98
COPPELL, TEXAS
PROJECT: GYMNASTICS CENTER Ot:R REPORT NO: 98686-10A
COPPELL, TEXAS
AREA OF WORK: FIREI,ANE FROM S.E. END N.WARD TO N.E. CORNER. W.WARD TO N.W. CORNER, &
S.WARD TO S.W. END.
DATE CEMENT [ ] LIME IX ] INITIAloI.Y APPI.IED 9/3/98 AVERAGE FINAl. COMPA(71'ED DEPTll: 6
INCHES
DATE OF FINAL MIXING: 09/I 0/98
SAMPLE LOCATIONS:
100% PASSING 60% PASSING
I 3/4" SIEVE it 4 SIEVE
FIREI.ANE FROM S.E. END N.WARD 250' 100 75
FIRELANE FROM S.E. END N.WARD 550' 100 75
FIRELANE FROM N.E. END W.WARD 150' 100 80
FIRELANE FROM N.E. END W.WARD 450' 100 90
FIRELANE FROM N.W. CORNER S.WARD 50' 100 85
REMARKS:
Geotechnical Engineering · Consfruc#(~ Materiats Test~ · Environmental Engineering · Consulting