Loading...
Denton Tap L2R BA-LR 971110 ALPHA TESTII~ INC. 2209 wisconsin St.. Suite 100 REPL~RT OF FIELD Dallas, Texas 75229 COMPACTION TESTS (972) 62o.89 BC&B J.V. 11/10/97 TESTED FOR C/O LM FAMILY INC. DATE PROJECT DENTON TAP DEVELOPMENT OUR REPORT NO. 97877-1 COPPELL, TEXAS TEST DATA: TEST ELEV. i SOILID OPI'IM UM I MAXIMI.'IM ',..A~ IN I=~.-ACE IN ~L*a. CE I PIERCENT 1 MOISTURE DRY' OENS~'rY MO~STU~ Om'O~NSn'Y - COMMENT* NO. DATE DEPTH NUMBER % ~ % 1 11110 rG-2.0 9'/445/2 13.0 1i/.5 16.0 11', 2 11/10 FG-2 . 0 97445/2 13,0 117.5 15.7 118 !00 1-A 3 11/10 FG-2.0 97445/2 13.0 117.5 13.7 1.13 96 1-A / 4 11/I0 FG-2.0 97445/2 13.0 I 117.5 13.4 11! 100 1-A 5 11/I0 FG-2.0 97445/2 13,0 117,5 12.5 116 99 I-A 6 11/10 FG-2.0 97445/2 13.0 117,5 13.1 11; I00 1-A , " ~ - 13.4 !16 99 I 1-A ? 1,/~0 FG-2.0 97445/2 13.0 L17.5 ~ I TEST LOCATION' 1 STATION #1+00, 5' S OF CENTER LINE 2 STATION #3+50, 5' N OF CENTER LINE 3 j STATION #5+50, 5' S OF CENTER LINE NORTH ROAD WAY 4 ~ STATION #5+50, 5' N OF CENTER LINE SOUTH ROAD WAY 5 STATION #7+00, 5' N OF CENTER LiNE NORTH ROAD WAY 6 , STATION #7+00 , 5' S OF CENTER LINE SOUTH ROAD WAY 7 I STATION #7+50, 50' N OF CENTER LINE SOUTH ROAD WAY 2 NATURAL SUBGRADE S PERCENT COMPACTION DOES NOT COMP~.Y WiTH SPECIFICATIONS 3 ~.'ME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIOI~S /,~ZL..~y~,~/C.-~T~.~., .- , .,~.~-~ ~, =t CEMENT TREA'?ED D. RE"'EST $G0;083-18