RE Proposed Change Order No 1 (2)thanks From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Tuesday, May 01, 2012 5:14 PM To: Richard Odell; Marty Murphy Subject: RE: Proposed Change Order No. 1 I see your point. Let me think it over and get back to you in the morning. Keith >>> "Marty Murphy" <Martym@JRJPaving.com <mailto:Martym@JRJPaving.com> > 5/1/2012 5:10 PM >>> Keith, If you remember when we met onsite on 4/12, I believe it was, and there was one lot that Yancey was not agreeing to which was the one on the corner. All of the other lots he said he was good with but he wanted to run it by Drees. That lot was fixed that same day and we did not hear back from Yancey for another week where he came back and said Drees was not accepting. These lots were corrected the next day after getting a response from him. The contract is to get acceptance from the Developer not the builder, Yancey was accepting of these lots other than 1R which was fixed on the 12th. I do not see where I can be held accountable for the delay of Yancey getting back a week later in reducing my bonus unless he wants to cover the cost of these delays. We fixed the other five or six lots within four hours the next day so all of this could have been fixed on the 12th or 13th had we known this was an issue. In fact I received a call from Glenn Engineering saying they indeed did shoot grade in the swales on the lot lines and not on the pads except the one shot in the middle they took. We missed the one day of the bonus due to KCK not having all their items corrected until the 13th. Had we been told by Yancey, the Developer, he was not accepting the lots we would have fixed them that day. As what he said was he was happy with them and for us not to touch them unless Drees disapproved. When he said that we waited on him to respond before we did anything else so how can you hold up our bonus based on these facts. Marty -----Original Message----- From: Keith Marvin [mailto:KMARVIN@coppelltx.gov] <mailto:[mailto:KMARVIN@coppelltx.gov]> Sent: Tuesday, May 01, 2012 1:13 PM To: Richard Odell; Marty Murphy Subject: Re: Proposed Change Order No. 1 Marty, I'm concerned about this incentive. Is it correct that these lots were not acceptable until the 19th? If so, would that not be 43 days of bonus? Keith -----Original Message----- From: "Marty Murphy" <Martym@JRJPaving.com <mailto:Martym@JRJPaving.com> > To: Keith Marvin <KMARVIN@coppelltx.gov <mailto:KMARVIN@coppelltx.gov> > Sent: 4/19/2012 5:26:43 PM Subject: Re: Proposed Change Order No. 1 Yes today Sent from my iPhone Marty Murphy, Business Manager On Apr 19, 2012, at 4:06 PM, "Keith Marvin" <KMARVIN@coppelltx.gov <mailto:KMARVIN@coppelltx.gov> > wrote: > Have you completed the re-grading of the lots? > > > -----Original Message----- > From: "Marty Murphy" <Martym@JRJPaving.com <mailto:Martym@JRJPaving.com> > > To: Keith Marvin <KMARVIN@coppelltx.gov <mailto:KMARVIN@coppelltx.gov> > > > Sent: 4/19/2012 3:59:13 PM > Subject: RE: Proposed Change Order No. 1 > > Phase three was completed on 4/13/12 after re-inspection by water department, this would 49 days before 6/1/12, do you agree? > > > > From: Keith Marvin [mailto:kmarvin@coppelltx.gov] <mailto:[mailto:kmarvin@coppelltx.gov]> > Sent: Thursday, December 01, 2011 10:58 AM > To: Marty Murphy > Cc: Leslie Henderson; Richard Odell > Subject: RE: Proposed Change Order No. 1 > > > > Marty, > > > > Based on your request, I have modified the attached Change Order No. 1. We increased the Phase II time to 120 days. In doing so, we reduced the incentive amount from $3,000/day to $2,000/day. This exceeds the original contract amount for time and incentive. > > > > If you are agreeable with this change order, please print and sign two copies and send them to us for execution. This will make the change order we take to City Council on 12/13 CO #2. We will be recommending the re-route option as it will provide more cover over the top of the 16" water line. I will work up the preliminary Change Order and send it to you for review. > > > > Thanks, > > > > Keith > > > > > > > > Keith Marvin, P.E. > Project Engineer > (972) 304-3681 > >>>> "Marty Murphy" <Martym@JRJPaving.com <mailto:Martym@JRJPaving.com> > 11/14/2011 3:08 PM >>> > > I am good with everything you have except the Phase II constraints of the bonus only being achieved if the work is complete in less than 90 days. I don't think we can open two lanes in 90 days therefore we would have no chance at any of the bonus. I am good with the 120 days but would like to see us have the opportunity to achieve the bonus if completed in less than 120 days with the same maximum bonus amount. > > > > Marty Murphy, > > Business Manager > > > > JRJ Paving, LP > > 1805 Royal Lane, Ste. 107 > > Dallas, TX. 75229 > > 214-466-8340 > > 214-466-8354 Fax > > > > From: Keith Marvin [mailto:kmarvin@coppelltx.gov] <mailto:[mailto:kmarvin@coppelltx.gov]> > Sent: Thursday, November 10, 2011 5:16 PM > To: Marty Murphy > Subject: Proposed Change Order No. 1 > > > > Marty, > > > > Look this over and let me know what you think. > > > > Keith > > > > > > Keith Marvin, P.E. > Project Engineer > (972) 304-3681 > > 漺㵡產湲猺档浥獡洭捩潲潳瑦挭浯漺晦捩㩥捡楴慶楴湯•浸湬㩳瑨汭∽瑨灴⼺眯睷眮⸳牯⽧剔刯䍅栭浴㑬∰砠汭獮焺∽瑨灴⼺猯档浥獡砮汭潳灡漮杲猯慯⽰湥敶潬数∯砠汭獮爺捴∽瑨灴⼺洯捩潲潳瑦挮浯漯晦捩湥瑥振湯敦敲据湩≧砠汭獮䐺∽䅄㩖•浸湬㩳敒汰∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯爯灥⽬•浸湬㩳瑭∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯猯慨敲潰湩⽴潳灡洯敥楴杮⽳•浸湬㩳㉸∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯漯晦捩⽥硥散⽬〲㌰砯汭•浸湬 㩳灰慤∽瑨灴⼺眯睷瀮獡灳牯⹴潣⽭慎敭灓捡⹥獸≤砠汭獮漺獩∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯猯慨敲潰湩⽴潳灡漯獩∯砠汭獮携物∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯猯慨敲潰湩⽴潳灡搯物捥潴祲∯砠汭獮携㵳栢瑴㩰⼯睷⹷㍷漮杲㈯〰⼰㤰砯汭獤杩∣砠汭獮携灳∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯猯慨敲潰湩⽴獤≰砠汭獮町捤∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯搯瑡⽡摵≣砠汭獮砺摳∽瑨灴⼺眯睷眮⸳牯⽧〲㄰堯䱍捓敨慭•浸湬㩳畳㵢栢瑴㩰⼯捳敨慭 ⹳業牣獯景⹴潣⽭桳牡灥楯瑮猯慯⽰〲㈰ㄯ愯敬瑲⽳•浸湬㩳捥∽瑨灴⼺眯睷眮⸳牯⽧〲㄰〯⼴浸敬据∣砠汭獮猺㵰栢瑴㩰⼯捳敨慭⹳業牣獯景⹴潣⽭桳牡灥楯瑮∯砠汭獮猺獰∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯猯慨敲潰湩⽴潳灡∯砠汭獮砺楳∽瑨灴⼺眯睷眮⸳牯⽧〲㄰堯䱍捓敨慭椭獮慴据≥砠汭獮町捤㵳栢瑴㩰⼯捳敨慭⹳業牣獯景⹴潣⽭慤慴甯捤猯慯≰砠汭獮町捤晸∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯搯瑡⽡摵⽣浸晬汩≥砠汭獮町捤㉰㵰栢瑴㩰⼯捳敨 慭⹳業牣獯景⹴潣⽭慤慴甯捤瀯牡瑴灯牡≴砠汭獮眺㵦栢瑴㩰⼯捳敨慭⹳業牣獯景⹴潣⽭桳牡灥楯瑮猯慯⽰潷歲汦睯∯砠汭獮携獳㵳栢瑴㩰⼯捳敨慭⹳業牣獯景⹴潣⽭景楦散㈯〰⼶楤獧杩猭瑥灵•浸湬㩳獤楳∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯漯晦捩⽥〲㘰搯杩楳≧砠汭獮洺獤楳∽瑨灴⼺猯档浥獡漮数确汭潦浲瑡⹳牯⽧慰正条⽥〲㘰搯杩瑩污猭杩慮畴敲•浸湬㩳癭牥∽瑨灴⼺猯档浥獡漮数确汭潦浲瑡⹳牯⽧慭歲灵挭浯慰楴楢楬祴㈯〰∶砠汭獮洺∽瑨灴 ⼺猯档浥獡洮捩潲潳瑦挮浯漯晦捩⽥〲㐰ㄯ⼲浯汭•浸湬㩳牭汥㵳栢瑴㩰⼯捳敨慭⹳灯湥浸晬牯慭獴漮杲瀯捡慫敧㈯〰⼶敲慬楴湯桳灩≳砠汭獮猺睰㵰栢瑴㩰⼯業牣獯景⹴潣⽭桳牡灥楯瑮眯扥慰瑲慰敧≳砠汭獮攺ㅸ琲∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯支捸慨杮⽥敳癲捩獥㈯〰⼶祴数≳砠汭獮攺ㅸ洲∽瑨灴⼺猯档浥獡洮捩潲潳瑦挮浯支捸慨杮⽥敳癲捩獥㈯〰⼶敭獳条獥•浸湬㩳灰獴㵬栢瑴㩰⼯捳敨慭⹳業牣獯景⹴潣⽭桳牡灥楯瑮猯慯⽰汓摩䱥扩慲祲∯ 砠汭獮猺獰㵬栢瑴㩰⼯業牣獯景⹴潣⽭敷獢牥楶散⽳桓牡健楯瑮潐瑲污敓癲牥倯扵楬桳摥楌歮即牥楶散•浸湬㩳㵚產湲猺档浥獡洭捩潲潳瑦挭浯∺砠汭獮猺㵴☢ㄣ∻砠汭獮∽瑨灴⼺眯睷眮⸳牯⽧剔刯䍅栭浴㑬∰㰾敨摡㰾敭慴渠浡㵥敇敮慲潴⁲潣瑮湥㵴䴢捩潲潳瑦圠牯⁤㈱⠠楦瑬牥摥洠摥畩⥭㸢猼祴敬㰾ⴡഭ⼊‪潆瑮䐠晥湩瑩潩獮⨠യ䀊潦瑮昭捡൥ †晻湯⵴慦業祬∺慃扭楲⁡慍桴㬢਍†瀠湡獯ⵥ㨱′‴‵″‵‴‶″′㬴ൽ䀊潦瑮昭捡൥ †晻湯⵴慦 業祬䌺污扩楲഻ †慰潮敳ㄭ㈺ㄠ‵‵′′′‴″′㬴ൽ⼊‪瑓汹⁥敄楦楮楴湯⁳⼪਍⹰獍乯牯慭ⱬ氠⹩獍乯牯慭ⱬ搠癩䴮潳潎浲污਍†笠慭杲湩〺湩഻ †慭杲湩戭瑯潴㩭〮〰瀱㭴਍†映湯⵴楳敺ㄺ⸱瀰㭴਍†映湯⵴慦業祬∺慃楬牢≩∬慳獮猭牥晩㬢ൽ愊氺湩Ⱬ猠慰⹮獍䡯灹牥楬歮਍†笠獭ⵯ瑳汹ⵥ牰潩楲祴㤺㬹਍†挠汯牯戺畬㭥਍†琠硥⵴敤潣慲楴湯町摮牥楬敮紻਍㩡楶楳整Ɽ猠慰⹮獍䡯灹牥楬歮潆汬睯摥਍†笠獭ⵯ瑳汹ⵥ牰潩楲祴㤺㬹਍†挠 汯牯瀺牵汰㭥਍†琠硥⵴敤潣慲楴湯町摮牥楬敮紻਍灳湡䔮慭汩瑓汹ㅥഷ †浻潳猭祴敬琭灹㩥数獲湯污挭浯潰敳഻ †潦瑮昭浡汩㩹䌢污扩楲Ⱒ猢湡⵳敳楲≦഻ †潣潬㩲楷摮睯整瑸紻਍䴮潳桃䑰晥畡瑬਍†笠獭ⵯ瑳汹ⵥ祴数攺灸牯⵴湯祬紻਍灀条⁥潗摲敓瑣潩ㅮ਍†笠楳敺㠺㔮湩ㄠ⸱椰㭮਍†洠牡楧㩮⸱椰⸱椰⸱椰⸱椰㭮ൽ搊癩圮牯卤捥楴湯റ †灻条㩥潗摲敓瑣潩ㅮ紻਍ⴭ㰾猯祴敬㰾ⴡ嬭晩朠整洠潳㤠㹝砼汭ാ㰊㩯桳灡摥晥畡瑬⁳㩶硥 㵴攢楤≴猠楰浤硡∽〱㘲•㸯਍⼼浸㹬ℼ敛摮晩ⵝ㸭ℼⴭ楛⁦瑧⁥獭崹㰾浸㹬਍漼猺慨数慬潹瑵瘠攺瑸∽摥瑩㸢਍漼椺浤灡瘠攺瑸∽摥瑩•慤慴∽∱⼠ാ㰊漯猺慨数慬潹瑵㰾砯汭㰾嬡湥楤嵦ⴭ㰾栯慥㹤戼摯⁹慬杮䔽ⵎ单氠湩㵫汢敵瘠楬歮瀽牵汰㹥搼癩挠慬獳圽牯卤捥楴湯㸱瀼挠慬獳䴽潳潎浲污㰾㩯㹰渦獢㭰⼼㩯㹰⼼㹰⼼楤㹶⼼潢祤㰾栯浴㹬渀祬尻屽慰⁲灀条⁥潗摲敓瑣潩ㅮ灜牡尠慴⁢筜楳敺㠺㔮湩ㄠ⸱椰㭮灜牡尠慴⁢慭杲湩ㄺ〮湩ㄠ〮湩ㄠ〮湩ㄠ 〮湩尻屽慰⁲楤⹶潗摲敓瑣潩ㅮ灜牡尠慴⁢筜慰敧场牯卤捥楴湯㬱絜灜牡ⴠ㸭ൽ笊⩜桜浴瑬条㐲‹⼼瑳汹㹥ൽ笊⩜桜浴瑬条㐲‱ℼⴭ楛⁦瑧⁥獭崹㰾浸㹬灜牡㰠㩯桳灡摥晥畡瑬⁳㩶硥㵴攢楤≴猠楰浤硡∽〱㘲•㸯灜牡㰠砯汭㰾嬡湥楤嵦ⴭ紾਍屻尪瑨汭慴㉧ㄴ㰠ⴡ嬭晩朠整洠潳㤠㹝砼汭尾慰⁲漼猺慨数慬潹瑵瘠攺瑸∽摥瑩㸢灜牡㰠㩯摩慭⁰㩶硥㵴攢楤≴搠瑡㵡ㄢ•㸯灜牡㰠漯猺慨数慬潹瑵㰾砯汭㰾嬡湥楤嵦ⴭ紾਍屻尪瑨汭慴㑧‱⼼敨摡紾਍屻尪瑨汭 慴㕧‰戼摯⁹慬杮䔽ⵎ单氠湩㵫汢敵瘠楬歮瀽牵汰㹥屽瑨汭瑲⁦汜湡ㅧ㌰″桜浴牬晴‰਍屻尪瑨汭慴㥧‶搼癩挠慬獳圽牯卤捥楴湯㸱屽瑨汭瑲⁦屻瑨汭瑲てഠ笊⩜桜浴瑬条㐶㰠⁰汣獡㵳獍乯牯慭㹬屽瑨汭瑲⁦屻瑨汭瑲てഠ笊⩜桜浴瑬条㐲‴漼瀺紾਍屻尪瑨汭慴㡧‴渦獢㭰屽瑨汭瑲⁦❜ち桜浴牬晴‰਍屻尪瑨汭慴㉧㈵㰠漯瀺紾桜浴牬晴灜牡屽瑨汭瑲て਍桜浴牬晴尠慰൲尊瑨汭瑲てഠ笊⩜桜浴瑬条㈷㰠瀯紾਍屻尪瑨汭慴ㅧ㐰㰠搯癩紾桜浴牬晴素桜浴牬晴 ‰਍屻尪瑨汭慴㕧‸⼼潢祤紾਍屻尪瑨汭慴㉧‷⼼瑨汭紾}