Loading...
RE City of Coppell service requirements (3)Keith: I previously submitted all of the 44 home lots; the entry feature; cottage 11-13 and retail 1. The load sheets are from some time ago but I updated them to reflect the expected delivery dates. Thanks, Gregory K. Yancey Provident Company, Inc. PO Box 1790 Coppell, TX 75019 V (214) 215-9400 F (214) 276-1709 gregyancey@verizon.net <mailto:gregyancey@verizon.net> From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Tuesday, June 26, 2012 2:06 PM To: Dan Prendergast (drp@freese.com); gregyancey@verizon.net; Brad Reid Subject: FW: City of Coppell service requirements Gentlemen, Oncor is requesting load sheets for the power services we are attempting to establish. As I understand it, Oncor calculates an allowable expenditure based on the anticipated usage, and then bills the customer for the cost above the allowable. They are planning to install 3 transformers, and those transformers will power the two services being installed under the infrastructure project at 710 Main, and 768 W. Main. These two services will power the irrigation, tree well outlets, and parking lot lights. Freese will need to fill out two forms, one for each service. Since the entry feature and pavilion will also be fed from these two transformers, including these load sheets should increase our allowable, thereby reducing the city’s cost. Brad & Greg, could you fill one of these out for your use and return it to me? Please call me with any questions. Thanks, Keith Keith Marvin, P.E. City of Coppell 972-304-3681 From: Karen Eastman [mailto:Karen.Eastman@oncor.com] <mailto:[mailto:Karen.Eastman@oncor.com]> Sent: Tuesday, June 26, 2012 10:37 AM To: Rick Fielding Cc: Keith Marvin Subject: RE: City of coppell service requirements Attached is the commercial load requirement form requested below. Please follow Rick’s instruction below regarding filling out the document 3 times. Thank You, Karen Eastman New Construction Manager Oncor Electric Delivery 200 North Ector Euless, Texas 76039 Office 817-355-7050 Fax 817-355-7090 From: Fielding, Rick Sent: Monday, June 25, 2012 3:05 PM To: Eastman, Karen Cc: Keith Marvin (kmarvin@coppelltx.gov <mailto:kmarvin@coppelltx.gov> ) Subject: City of coppell service requirements Karen, Please send Keith Marvin a load requirement form. We will be energizing 3 single phase transformers to get power to Entry feature, landscape irrigation, Etc. Keith, Please turn in 3 load requirement forms with 3 separate addresses. We already visited as to which 3 transformers we will install. Thanks! Rick Fielding Project Manager Oncor Electric Delivery 14400 Josey Lane Farmers Branch, Texas 75234 cell 469-261-5255 rick.fielding@oncor.com <mailto:rick.fielding@oncor.com> Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.