Loading...
WA9302A-CS 950123 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. '/ .~,+ ~/'l~" L~ JAMES E. LAUGHLIN, P.E. ~ (~ RONALD V. CONWAY, RE. JOHN W. BIRKHOFE P.E. MATT ARMSTRONG, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, RE. January 23, 1995 C. L. SHIMEK, RE. I. C. FINKLEA, RE. Mr. Kenneth M. Griffin, P.E. Assistant City Manager/Director of Public Works/City Engineer City of Coppell, Texas Post Office Box 478 Coppell, Texas 75019-0478 Re: Village Parkway Pump Station Expansion Water Distribution System Conversion Dear Mr. Griffin: As you requested, we have converted the City of Coppell's existing KY Pipe Water Distribution System data into the Cybemet model format. The conversion includes data from the existing system, the year 2004 system and the year 2014 system. The Cybernet models were developed from data provided by the City of Coppell. We did not attempt to revise the data provided by the City or otherwise analyze the water system. However, we did notice a few geometric problems with the data set provided and made the necessary corrections. We are enclosing marked up copies of the water map sho,~ing the corrections we made. In addition, all water lines in the data sets provided, regardless of age, size or condition, were set at a roughness coefficient of c = 120. For some of the older and smaller diameter lines within the system, this may not be an appropriate c value. We did model the Village Parkway Pump Station, adding in piping for the suction header, discharge header and surge relief line. Those elements were not in the data sets provided. As there are other items conceming the model we would like to discuss with you, we would appreciate the oppommity to present what we have completed. At your convenience, we would be happy to set up a presentation in your office using your Cybemet software, or if you prefer, we can show the models here at our office. Each completed model has over 900 pipes and therefore we recommend a version of the Cybernet program which can run at least 1,000 pipes. We are available to discuss this project further at your convenience. Sincer s, ' Gary C. Hendricks, .E. VILLAGE PARKWAY PUMPSTATION LINE: 2C NEW GROUND STORAGE TANK 124 ~e' 30'D~J " fi~. ~z~7 ~- "' ",. C~ "~ /' .-::z ~'~ ..'. ~' "' 2N ,t '~ 1E2 r 'PUMP STA~ON " " ,,' tEW GROUND TORAGE TANK NEW ELEVATED TANK ,. B" ," ,,:,' :,~ UNE 2B2 2.,' I0' U,/ e' Z 8* ~' UNE 281 .~ UNE 2E ~NF' 2K ~r __ Z ' s' ---.,,-., --,. e' 8' r" 8' e' · /~ ,~, ~ /' HaL ,~ D~ ~ .. '~_ ' '~ ~OE PARKWAY ' ' PUMPSTAlON .,, ,. LINE 2C NEW GROUND STORA~ TANK I' 8' I' e' e' ~ %~ ~ e- ~ 24' ~ NEW ELEVATED TANK . · .2oo4~ ~ ~ q~ -- " TOTAL DYNAMIC HEAD (F'E "~ o 88 8 8 . __,, ~ II ~ I ~ / ,--' 0 UI ~ X 0 -- (,4 ... Ii ~ ~ / , ~ / ' 8 0 ~ 0 ~ TOTAL DYNAMIC HEAD (FEB) tJ~ ~:D f. Tm C) O O O c: O ~; ..... .,:,_ ...... rrm r-" CZC: // · //// II .~ i,,) I~ ...... 0 '~ / / · == I'~ ~'~ r,, / ~ - ........ """"' TOTAL DYNAMIC HEAD (FEET) 0 (.,n 'o , :" y 0 ~ / ,/,~//'/~ C C: u~ I °~- / -r (,,,n / l- 'r '0 < "~ J C: ~ ' c · OR ,~ ~ rn -o ._, C:t,_ ~ ~: z0 '< ;:0 k~ I~ U*, ~ ' rq ('~ "0 0 0 ~ -r O ~ 0 4~ SHIMEK, JACOBS & FINKI,EA CONSULTING ENGINEERS 8333 Douglas Avenue,//820 Dallas, Texas 75225 (214) 361-7900 ROSS L. JACOBS, P.E. JAMES E. LAUGHLIN, P.E. RONALD V. CONWAY. P.E. JOHN W. BIRKHOFF, P.E. MATt ARMSTRONG. P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. February I, 1995 C. L. SHIMEK, P.E. 1. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E.; Assistant City Manager/Director of Public Works/City Engineer City of Coppe!l, Texas Post Office Box 478 Coppell, Texas 75019-0478 Re: Village Parkway Pump Station Expansion Water Distribution System Conversion Dear Mr. Griffin: We are delivering two electronic disk each of the City of Coppe!l, Water Distribution System analysis data which we have converted to the Cybernet model format. The attached Table No. 1 shows the files created from the KY Pipe data provided by the City. The 1995 data set with system improvements was not originally provided; however, the improvements were described in the analysis report. Using the analysis report information, we were able to create the existing system model which includes the proposed improvements. Table No. 2 shows the recommended improvements to the existing system and the assigned Cybernet line number. We are available at you convenience to discuss this project further. Gary C. Hendricks, P.E. Enclosure '-' ~ 211195 CITY OF COPPELL WATER DISTRIBUTION SYSTEM CYBERNET CONVERSION TABLE I FILE MANAGEMENT File Name Description EX_1995.DWG Existing System No Improvements EX 1995.CYB <DIR> Database EX_95IMP.DWG Existing System With Improvements EX 95IMP.CYB <DIR> Database PR_2004.DWG New Pump Station, 2004 Improvements PR_2004.CYB <DIR> Database PR_2014 .DWG Year 2014 Improvements I PR_2014.CYB <DIR> Database 1 ) All databases are carried as attributes within the Cybemet drawing files. 2) Each drawing contains data for Average Day, Maximum Day and Peak Hour Demands, as established by Rady & Associates. 3) As drawings are accessed and database files are created (both input and output), database files are automatically filed in drawing file .CYB subdirectories. SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS DALLAS, TEXAS 2/I/9 5 · CITY OF COPPELL WATER DISTRIBUTION SYSTEM CYBERNET CONVERSION TABLE 2 EXISTING SYSTEM WITH RECOMMENDED IMPROVEMENTS Rady & Assoc. Cybernet Line Designation Line Number. Connecting Nodes 1A 9000 355 - 652 1B 9001 255 - 301 1C 9002 101 - 151 1D 9003 556 - 557 1El 9004 1404 -1413 1E2 9005 1413 -1414 1F 9006 873 - 901 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS DALLAS, TEXAS