Old Town CoordinationGreg,
Just a followup on our conversation. Both Freese & Nichols and I are
prepared to meet to discuss your concerns with the construction plans
for the Old Town project. My direction based on your meeting with Clay
yesterday was to set up a meeting with you and Glenn Engineering to
discuss project grades.
Based on our conversation this morning you've indicated that you do not
believe that meeting is necessary. Should this change, please advise as
to your availability, and we will schedule a meeting as needed.
Freese has been advised to make the electronic copies of their drawings
available to you for your use in completing the detailed design for your
individual lots. Please contact Trish Hatley to make arrangements for
the necessary file transfer. Please understand that these files do not
represent as-built conditions, and that they may change during the
construction of this project.
I believe we also addressed the concerns surrounding the engineering
costs associated with the project to date. I will advise Mindi and Clay
what we discussed, and that conversation can continue at a later date.
Don't hesitate to contact me if I can be of further assistance.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681