Loading...
RE Old Town walk thruThank you John From: John Elias [mailto:JElias@coppelltx.gov] Sent: Wednesday, July 25, 2012 11:46 AM To: Marty Murphy Cc: Keith Marvin; casey@superscapes.net Subject: RE: Old Town walk thru Marty, I walked the project with Casey Bambico (Superscapes) at 11:00 today. We were unable to run through the irrigation system due to the lack of power, it does no good to check irrigation manually. Most irrigation problems are issues with wiring, valves & solenoids. I cannot accept the irrigation until we can run through it with the controller. As far as the landscaping, it looks pretty good for July. It looks like some of the red oaks are in trouble, I talked to Casey about watering as well as the potential for bores. At this point I have no problem issuing a Substantial Completion for the landscape & irrigation, but by no means should it be considered accepted. Thank You John Elias Park Operations Manager City of Coppell From: Marty Murphy [mailto:martym@jrjpaving.com] <mailto:[mailto:martym@jrjpaving.com]> Sent: Tuesday, July 24, 2012 2:13 PM To: John Elias Subject: Old Town walk thru John, I was of the understanding that we were going to be able to do a substantial completion walk thru today on the irrigation and landscaping along with the other items on this project. I am now told to contact you directly to set this up. I will be leaving JRJ at the end fo this week and wanted to see if you could walk this project before I leave. Can you please check your schedule and let me know if this is possible. Marty