Loading...
RE Final JT PlanKeith: Still waiting on Mike Glenn’s comments, but I have a few. Thanks, Atmos Is there service to cottages 5 & 6? Do we need to sleeve before the alley is poured? Oncor Can the conduit be run further east? S3-S5 will likely require moisture conditioning which is typically 5’ outside the foundation area. I can’t tell from the plan if we will be alright. If the developer ends up with the irrigation service to the east side of Burnet, do you want the power run along the alley in the Cottage 10 lot to the r.o.w area? Thanks, Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net <mailto:gregyancey@verizon.net> ________________________________ From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Thursday, February 02, 2012 8:22 AM To: Greg Yancey Subject: Re: Final JT Plan Yes. See attached. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Greg Yancey" <gregyancey@verizon.net> 2/1/2012 8:21 PM >>> Hi Keith: Did we ever get the revised J T plan? Thanks, Gregory K. Yancey Provident Company (214) 215-9400 v (214) 276-1709 f gregyancey@verizon.net <mailto:gregyancey@verizon.net>