Re City power services for Old Town Coppell (2)That transformer location we met at only had 2 conduits turned up. We need the 3rd conduit turned up. Make sure that gets done. Thanks! Rick Fielding On Jun 18, 2012, at 5:00 PM, "Keith Marvin" <KMarvin@coppelltx.gov> wrote: > They are supposed to be out there turning up conduit for transformers now. I understand all conduit was installed per the Oncor plan. > > Keith Marvin, P.E. > City of Coppell > > On Jun 18, 2012, at 4:33 PM, "Rick Fielding" <Rick.Fielding@oncor.com> wrote: > >> Yes, i was able to open and ran into Keith at site. I had some questions about how the civil was installed near 1 of the transformer locations. >> >> Keith, did you get some answers on this. >> >> Thanks! >> >> Rick Fielding >> >> On Jun 18, 2012, at 4:32 PM, "Eastman, Karen" <Karen.Eastman@oncor.com> wrote: >> >>> Keith, >>> I apologize but I was unable to open the file. All I really need is a print with the area circled where the two transformers need to be and the load requirements document. >>> >>> Rick, >>> Were you able to open them? >>> >>> Thank You, >>> >>> Karen Eastman >>> New Construction Manager >>> Oncor Electric Delivery >>> 200 North Ector >>> Euless, Texas 76039 >>> Office 817-355-7050 >>> Fax 817-355-7090 >>> >>> >>> >>> -----Original Message----- >>> From: Keith Marvin [mailto:KMarvin@coppelltx.gov] >>> Sent: Tuesday, June 12, 2012 11:26 AM >>> To: Eastman, Karen; Fielding, Rick >>> Subject: FW: City power services for Old Town Coppell >>> >>> I just sent the below email, but it bounced back and said the attachment was too large. Please follow this link to our FTP site to download the attachment: ftp://ftp1.ci.coppell.tx.us/eng >>> >>> The file is called Oncor.zip >>> >>> Thanks. >>> >>> Keith >>> >>> -----Original Message----- >>> From: Keith Marvin >>> Sent: Tuesday, June 12, 2012 11:02 AM >>> To: 'Eastman, Karen'; 'Rick Fielding' >>> Cc: 'drp@freese.com'; Rick Odell; 'gregyancey@verizon.net'; Brad Reid; Mindi Hurley >>> Subject: City power services for Old Town Coppell >>> >>> Karen, >>> >>> Here are the plans showing the two new power services that we are needing to establish within the Old Town Coppell project area. We will initially be powering 70 tree well receptacles, two irrigation controllers, and 10 parking lot lights from these two services. >>> >>> The transformer set at location number 1 should be adequately sized to power the future public pavilion and rest room. The transformer set at location number 2 will likely feed several of the cottages in the area as well. I believe Greg Yancy has already provided load sheets for the cottages. >>> >>> Please let me know what else you need from us to begin the process of establishing these services. >>> >>> Thanks, >>> >>> Keith >> >> Confidentiality Notice: This email message, including any attachments, >> contains or may contain confidential information intended only for the >> addressee. If you are not an intended recipient of this message, be >> advised that any reading, dissemination, forwarding, printing, copying >> or other use of this message or its attachments is strictly prohibited. If >> you have received this message in error, please notify the sender >> immediately by reply message and delete this email message and any >> attachments from your system. >> >> > > Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.