Re Fwd Phase 2 LandscapeFor consistency throughout the development, it looks like we should
stick with the Big Blue Liriope in the parking lot islands near the
square to match those in other areas. The "turf" that is proposed in
the Feldman plan will likely have problems looking good in the long run,
as will the Liriope.
BR
>>> Keith Marvin 5/23/2012 5:18 PM >>>
I've been asked to send these plans out for your consideration.
Attached are the approved landscape plans for the portion of Main Street
between Bethel and Houston.
I'm also including a Phase 2 landscape plan that was started by Freese
for the area around the square. They are no longer working on this due
to the overlapping scope with the pavilion design.
I hope these help.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681