Loading...
Re Fwd Phase 2 LandscapeFor consistency throughout the development, it looks like we should stick with the Big Blue Liriope in the parking lot islands near the square to match those in other areas. The "turf" that is proposed in the Feldman plan will likely have problems looking good in the long run, as will the Liriope. BR >>> Keith Marvin 5/23/2012 5:18 PM >>> I've been asked to send these plans out for your consideration. Attached are the approved landscape plans for the portion of Main Street between Bethel and Houston. I'm also including a Phase 2 landscape plan that was started by Freese for the area around the square. They are no longer working on this due to the overlapping scope with the pavilion design. I hope these help. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681