Loading...
PA0101-LR010629CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Report Dallas, Texas 75247 Serv e 29, 2001 ~ (214) 63O-lOlO CliE :: City of Col - Parks & Re< Report~T Attn: Projec~ Andrew Brown Pa~ East ~ Moore Road 732 DeForest ~ Coppell, Texas~' Coppell TX 75019 Project ~umber: 9~03 formation Sampl~lnfor. m~tion Specified Strength: 3000 psi @ 28 Days Sample Time: 6:20am Date Cast: June 29, 2001 Technician: Anthony Mercier Batch Time: 5:59am Plant: 41 Weather Conditions: Supplier: TXI Accumulative Yards: 120 Truck No: 462 Ticket No: 2927232 Placement Method: Pump Mix I.D. No.: 8272 Sample Locations: 10' N of Baseball Field, Light #5 Placement Location: Andrew Trail PAP, 4 Field Test Data Test Result Specification Test Method Slump, inches: 4.00 3-5 ASTM C-143 Air Content, %: 3.8 N/A ASTM C-172 Concrete Temperature, o F: 77 ASTM C-39 Ambient Temperature, o F: 84 Plastic Unit Weight, pcf: Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) I 1 6.00 28.27 07/06/2001 7 97,300 3,440 1 2 6.00 28.27 07/06/2001 7 97,780 3,460 1 3 6.00 28.27 1 4 6.00 28.27 Average 4,170 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Anthony Mercier / ,~, // // Report Distribution: ~,H~H~.~//~, Inch . (1) city of Coppell - Parks & Recreation Reviewed by: (1) TLB Construction (1) City of Coppell - Constr. Insp. Eric J. Cleveland, P.E. Senior Project Engineer The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ENGINEERING, INC. 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 Date of Service: 06/29/01 Report No.: Client No.: COPPEL P r°J ect~940~3 Se~ices: Observe placement of reinforcing for compliance with fumi~mwings. PROJECT DATA Drawings Utilized: Locations/Items Obse~ed: Andrew Test Method: REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X ;olumn Tied Properly Bar Size X Proper Bar Placement X l-les and Spaces Bar Grade X Properly Tied X stirrup Spacing/Type 3,ebar Clean X Dowel Bars in Place X Welded Splices :orm Clean X Proper Bar Supports X Viechanical Splices qumber of Bars X Lapped Splices X Proper Cover Discrepancies/Comments: No discrepancies noted at the time of observation. Technician: A. Mercier  ng, Inc. Re,,ort Distribution: (1) City of Coppell - Parks & Recreation (1) TLB Construction (1) City of Coppell - Constr. Insp. Eric J. Cleveland, P. E. Senior Project Engineer 309sks This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of HBC Engineering, Inc.