Denton Tap L2R BA-CS010720 July 20, 2001
FILE
Preston Engineering And Construction
6310 LBJ Freeway Suite 208
Dallas, Texas 75240
RE.' Denton Tap Development (Everybody Fits)~I~V~'~
Fee Assessment Letter
Mr. White:
Enclosed is a copy of the revised City of Coppell Development Fee Assessment table that
includes the meter size changes as requested. A copy of the Development Fee
calculations for the referenced development is also included. The water impact fee
difference is $2,475.00, the wastewater impact fee difference is $1,350.00, the domestic
meter fee difference is $46.57 and the irrigation meter cost difference is $80.06. There
was a decrease of $84.26 in the cost of the 4" fireline meter on the new assessment.
However, the meter previously provided to you cost the City more so that savings cannot
be passed on.
Please make payment for the Impact Fees to the City of Coppell in the mount of
$3.825.00 and forward to the Engineering Department along with a copy of the Fee
Assessment table. This amount is a portion of the assessed fees that need to be paid prior
to Council approval.
The additional fees for water and sewer taps, water meters, and utility inspection fees
need to be paid by separate check at the Public Works Service Center, 732 Deforest.
Meters will be ordered when these fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this
project. We look forward to working with you on this project. If you have any questions,
please contact me.
Sincerely, t') I#of
Post-it' Fax N0te 7671 Da" q ~..~J 0 t ipages
Kenneth M. Griffin. P.E. c°~-5TO r,l /~-I',IC,~. co.
City Engineer ~'ho~e # Pho,;*
axqT q / ogzqq Fax.
H~RD.Co?y .'/~_._ FOL. Co~d VJYq
2~5 I=ARKWAY ~' P.O BOX 47a l' COPPEL,L TX 75019 *' TEL, 972/462 002.2 ~' FAX 972/304 3673,
cc: Jennifer Armstrong, Finance Director
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Assistant Director of Public Works
G-reg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Date: 7/20/2001
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee ~ $6,975.00
(100% due prior to Council Approval) ~ ~,+"/5-.0o pd-.~4/Xoo. 0o 51z?/qF
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $189.37
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,124.55
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
IrrigationJFireline Meter Deposit $60.00
(100% due at Issuance of Water Meter) _
Wastewater Impact Fee ~ .' $3,600.00
(100% due prior to Council Approval) ~t 1~50.00 io0t ~,2~O. oo ~z7/cig
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $8,386.06
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project
Street Sign Fee Information not Available
(I 00% due prior to Acceptance of Project
Construction Inspection Fee Information not Available
,.
TOTAL ~ ~/# ~,'~ .ti 2..
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL ,
DEVELOPMENT FEE WORKSHEET
PROJECT: Denton Tap Development (Everybody Fits)
Water Impact Fee:
Domestic Meter(s): 1 - 2 inch = 8 ESU's
Irrigation Meter(s): 1 - 1 1/2 inch '- 5 ESU's
0 = 0 ESU's
Fireline Meter(s): I -4 inch = 2.5 ESU's
Total #: 15.5 ESU's @ $450.00 ea. $6,975.00
(100% due pdor to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea. $150.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $189.37 $189.37
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: I Irrigation Meter(s) @ $137.81 $137.81
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 1 Fireline Meter(s) @ $986.74 $986.74
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: I Meter(s) @ $35.00 ea. $35.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $30.00 ea. $60.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8 @ $450.00 gal $3,600.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (Ail developments):
Total #: I Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved: After October 26, 1993
0 Single-family @ $0.00 per lot $0.00
0 Multi-family @ $0.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations) $8,386.06
Street Lighting Fees:
Assessed for lighting in the City's right-of-way. Information not Available
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Si~ Fees:
Assessed for signage in the City's right-of-way. Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Denton Tap Development (Everybody Fits)
DATE: 7/20/2001
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Institutional
Land Use ** Institutional Others Not Specified
Building Area (sO 49,917
Development Units ** 49.92
Vehicle Miles per Development Unit ** 0.56
Fee per Vehicle Mile *** $300
Roadway Impact Fee due --- (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $8,386.06
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
I AMOUNTDUE: $8.386.06