City Park Restaurant Three Phase Transformer Pad LocationsMr. Glenn:
I need to coordinate with the surveyor to locate these per the new
plat.
What do you suggest for pad elevations?
On mine, I am thinking at least 8β above the spot shot of the city
sidewalk due east or west of the locations. Itβs about 50β from the
sidewalks to the pads, I get 8 to 10β is enough.
Your thoughts?
The park contractor is graded and we are ready for Rodney. Glad to meet
his guys out there if necessary.
Thanks,
Gregory K. Yancey
Provident Company, Inc.
PO Box 1790
Coppell, TX 75019
V (214) 215-9400
F (214) 276-1709
gregyancey@verizon.net <mailto:gregyancey@verizon.net>