City of Coppell water line relocationGentlemen;
We appreciate your extreme efforts of coordination with TxDOT in
getting your approved water line relocations. In an effort to provide
our contractor with adequate workspace as soon as possible, we are
respectfully asking the City of Coppell to begin their proposed water
line construction if there is any way possible prior to the proposed
begin date of January 2, 2014.
Any effort to expedite the planned start of 1/2/14 would be extremely
appreciated. We (TxDOT) and our contractor are very anxious to get
this project started.
If there is anything that we can do to help with this, please let us
know.
Thanks,
Gary G. Gilmore
TxDOT East Dallas Area Utility / ROW Coordinator
972-225-0465
Gary.gilmore@txdot.gov
Drunk drivers wreck cars. And lives.
<http://www.txdot.gov/inside-txdot/media-room/news/statewide/028-2013.ht
ml>