Loading...
City of Coppell water line relocationGentlemen; We appreciate your extreme efforts of coordination with TxDOT in getting your approved water line relocations. In an effort to provide our contractor with adequate workspace as soon as possible, we are respectfully asking the City of Coppell to begin their proposed water line construction if there is any way possible prior to the proposed begin date of January 2, 2014. Any effort to expedite the planned start of 1/2/14 would be extremely appreciated. We (TxDOT) and our contractor are very anxious to get this project started. If there is anything that we can do to help with this, please let us know. Thanks, Gary G. Gilmore TxDOT East Dallas Area Utility / ROW Coordinator 972-225-0465 Gary.gilmore@txdot.gov Drunk drivers wreck cars. And lives. <http://www.txdot.gov/inside-txdot/media-room/news/statewide/028-2013.ht ml>