Loading...
WA8801-CS 890831 McL N CONSTRUC TI .c~ ~ ~ Utility Construction August 31, 1989 Mr. Gabe Favre Ginn, Inc. Consulting Engineers 17103 Preston Rd., Suite 100, LB Dallas, TX 75248 Re: 24" Crosstown Waterline~. Coppell, TX Dear Mr. Favre, We would like to express our appreciation to you and your Representatives for the help and consideration that was extended to us during the construction of our recently completed project. Through you as the Engineer, the City of Coppell as the Owner and McLean Construction as the Contractor, a quality water line has been installed which the city fathers can well be proud of. We *would also like to express our gratitude to Mr. Howard Pafford for his cooperation and assistance. If we can ever be of any help, please feel free to call us immediately. Sincerely, JM/kr CC ': Mr. Steve Goram, Director of Public Works Mr. Howard Pafford, Water Dept. Superintendent Mr. Russel Doyle, City Engineer