RE Tax 2010A & 2011BKeith
A couple of questions I want to verify on the sheet 6 water line plan
On the attached markup there appears to be a FH sketched in about 0+10
extending north on Denton Tap Road
Is this an additional FH, or is the FH at 0+33 to be moved there?
At Lakewood Drive, I interpreted the markup to mean extend the tie-in
for future reconstruction beyond the end of new pavement, and install a
wye and 45° bend to connect to the existing in its current location. Is
this correct? As shown on attached sheet 6, I extended 2’ past proposed
pvmt, called for pvmt cut repair, and a wye to connect to existing.
Thanks
Louis
LOUIS HUND, PE
SENIOR PROJECT MANAGER
JQi
1301 WEST 7th STREET, SUITE 141, FORT WORTH, TEXAS 76102
214 623.5866 PHONE 817 707.3131 CELL
JQENG.COM
The information in this e-mail is confidential and may be legally
privileged. It is intended solely for the addressee. Access by any other
person to this e-mail is not authorized. If you are not the intended
recipient, please delete this e-mail. Any disclosure of this e-mail or
of the parties to it, any copying, distribution, or any action taken or
omitted in reliance on it is prohibited, and may be unlawful.
From: Keith Marvin [mailto:kmarvin@coppelltx.gov]
Sent: Monday, June 04, 2012 10:27 AM
To: Louis Hund
Cc: George Marshall; Raj Mehta
Subject: Fwd: Tax 2010A & 2011B
Louis,
George has completed his modifications to the bid documents. See
attached. He's made two changes that directly affect Vanbebber. He has
created a pay item for stamped concrete, which will require that you
back this quantity out of your concrete, and include it under the new
item. He has also eliminated the pay item for removal of concrete
culvert and made it subsidiary to ROW prep.
Please review these modified documents, and provide any additional
feedback you may have.
We still plan to advertize this Friday. We will need you concurrence
by Wednesday morning that we will be ready. We'll then handle the
advertizement. No later than Friday we'll need 10 sets of signed and
sealed full size plans, and a signed cover sheet of the contract
documents. We'll handle printing and binding the contract documents.
We'll also need a reproducible PDF of your drawings in case we need to
print more.
Please call me if you have any questions or concerns about this
schedule. Feel free to call George directly with any technical
questions on the changes he has made to the documents.
Thanks,
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> George Marshall 6/1/2012 4:32 PM >>>
Keith,
I have completed the bid docs ready for submittal to JQ. I'm sure we
will find some things that need to be changed before we finish but at
least this gives us a start.
The files are located under U:\Pcrocker\PROJECTS\STREET\ACTIVE
PROJECTS\Tax 2010\Willow Springs\Bid
I have created a PDF of each section and combined them together to one
PDF. All the word docs have the track changes turned on.
Thank You, George
George Marshall, P.E.
City of Coppell
Engineering
972-304-3562