RE Tax 2010A & 2011BKeith A couple of questions I want to verify on the sheet 6 water line plan On the attached markup there appears to be a FH sketched in about 0+10 extending north on Denton Tap Road Is this an additional FH, or is the FH at 0+33 to be moved there? At Lakewood Drive, I interpreted the markup to mean extend the tie-in for future reconstruction beyond the end of new pavement, and install a wye and 45° bend to connect to the existing in its current location. Is this correct? As shown on attached sheet 6, I extended 2’ past proposed pvmt, called for pvmt cut repair, and a wye to connect to existing. Thanks Louis LOUIS HUND, PE SENIOR PROJECT MANAGER JQi 1301 WEST 7th STREET, SUITE 141, FORT WORTH, TEXAS 76102 214 623.5866 PHONE 817 707.3131 CELL JQENG.COM The information in this e-mail is confidential and may be legally privileged. It is intended solely for the addressee. Access by any other person to this e-mail is not authorized. If you are not the intended recipient, please delete this e-mail. Any disclosure of this e-mail or of the parties to it, any copying, distribution, or any action taken or omitted in reliance on it is prohibited, and may be unlawful. From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Monday, June 04, 2012 10:27 AM To: Louis Hund Cc: George Marshall; Raj Mehta Subject: Fwd: Tax 2010A & 2011B Louis, George has completed his modifications to the bid documents. See attached. He's made two changes that directly affect Vanbebber. He has created a pay item for stamped concrete, which will require that you back this quantity out of your concrete, and include it under the new item. He has also eliminated the pay item for removal of concrete culvert and made it subsidiary to ROW prep. Please review these modified documents, and provide any additional feedback you may have. We still plan to advertize this Friday. We will need you concurrence by Wednesday morning that we will be ready. We'll then handle the advertizement. No later than Friday we'll need 10 sets of signed and sealed full size plans, and a signed cover sheet of the contract documents. We'll handle printing and binding the contract documents. We'll also need a reproducible PDF of your drawings in case we need to print more. Please call me if you have any questions or concerns about this schedule. Feel free to call George directly with any technical questions on the changes he has made to the documents. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> George Marshall 6/1/2012 4:32 PM >>> Keith, I have completed the bid docs ready for submittal to JQ. I'm sure we will find some things that need to be changed before we finish but at least this gives us a start. The files are located under U:\Pcrocker\PROJECTS\STREET\ACTIVE PROJECTS\Tax 2010\Willow Springs\Bid I have created a PDF of each section and combined them together to one PDF. All the word docs have the track changes turned on. Thank You, George George Marshall, P.E. City of Coppell Engineering 972-304-3562