Loading...
Denton Tap L2R BA-CS 980107 ,~o[}o~1 Texas 75019 //~-~//~ The City With A Beautiful Future 972-462-0022 Bffi ~derson~ P.E. ~wdey Mderso~ & gsociate 5225 Village Creek Dr., Suite 200 P~no, TX Denton Tap Development Development. F~ ~~ent :. De~ Mr Aaerson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $15,136.06 and forward to ~e. Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forw., a~rd to working with you on this project. If you have any questions, please contact me. Sincerely, ~/~ Director of Engineering & Public Works cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Public Works Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Denton Tap Development Date: 1/7/98 TOTAL AMOUNT DUE FEES DUE i PRIOR TO COUNCIL APPROVAL Water Impact Fee $4,500.00 $4,500.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $144.38 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) ' $1,107.75 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100 % due prior to Council Approval) Roadway Impact Fee $8,386.06 $8,386.06 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100 % due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $16,738.19 TOTAL AMOLrNT DUE PRIOR TO coUNCIL APPRO¢qAL $15,136.06 DEVELOPMENT FEE WORKSHEET PROJECT: Denton Tap Development DATE: 1/7/98 '~ d Domestic Meter(s): 1 - 1 1/2 inchX'~ '^ [qJt/l-~O 5 ESU's Irrigation Meter(s): 1 1 inch ~ (~,/V = 2.5 ESU's = ESU's Fireline Meter(s): I - 4 inch = 2.5 ESU's Total #: 10 ESU's @ $450.00 ea. $4,500.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. $150.00 (Single family due prior to issuance of building permit) (All other developments due Prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $144.38 ~144.38 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (lrrigation/Fireline): Total #: 1 Irrigation Meter(s) @ 057.75 $57.75 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 1 Fireline Meter(s) @ $1,050.00 $1,050.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. $70.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ $450.00 es. $2,250.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 ! Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $8,386.06 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 4 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Denton Tap Development DATE: 1/7/98 ROADWAY IMPACT FEE: Service Area * 1 Category ** Institutional Land Use ** Others/Not Specified (Institutional) Building Size (Sq. Ft.) 49,917 Development Units ** 49.917 Vehicle Miles per Development Unit ** 0.56 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $8,386.06 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study)