Denton Tap L2R BA-CS 980107 ,~o[}o~1 Texas 75019
//~-~//~ The City With A Beautiful Future 972-462-0022
Bffi ~derson~ P.E.
~wdey Mderso~ & gsociate
5225 Village Creek Dr., Suite 200
P~no, TX
Denton Tap Development
Development. F~ ~~ent
:.
De~ Mr Aaerson:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $15,136.06 and forward to ~e.
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forw., a~rd
to working with you on this project. If you have any questions, please contact me.
Sincerely, ~/~
Director of Engineering & Public Works
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Works
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project: Denton Tap Development
Date: 1/7/98
TOTAL AMOUNT DUE
FEES DUE i PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $144.38
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) ' $1,107.75
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100 % due prior to Council Approval)
Roadway Impact Fee $8,386.06 $8,386.06
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100 % due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $16,738.19
TOTAL AMOLrNT DUE PRIOR TO coUNCIL APPRO¢qAL $15,136.06
DEVELOPMENT FEE WORKSHEET
PROJECT: Denton Tap Development
DATE: 1/7/98 '~ d
Domestic Meter(s): 1 - 1 1/2 inchX'~ '^ [qJt/l-~O 5 ESU's
Irrigation Meter(s): 1 1 inch ~ (~,/V = 2.5 ESU's
= ESU's
Fireline Meter(s): I - 4 inch = 2.5 ESU's
Total #: 10 ESU's @ $450.00 ea. $4,500.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea. $150.00
(Single family due prior to issuance of building permit)
(All other developments due Prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $144.38 ~144.38
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (lrrigation/Fireline):
Total #: 1 Irrigation Meter(s) @ 057.75 $57.75
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 1 Fireline Meter(s) @ $1,050.00 $1,050.00
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea. $70.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU' 5 @ $450.00 es. $2,250.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: I Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 3
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 ! Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $8,386.06
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at this time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 4
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Denton Tap Development
DATE: 1/7/98
ROADWAY IMPACT FEE:
Service Area * 1
Category ** Institutional
Land Use ** Others/Not Specified (Institutional)
Building Size (Sq. Ft.) 49,917
Development Units ** 49.917
Vehicle Miles per Development Unit ** 0.56
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $8,386.06
· (Figure 2 - Roadway Impact Fee Study)
· * (Table 3 - Roadway Impact Fee Study)
· ** (Schedule 2, Page 3 - Roadway Impact Fee Study)