WA8801-CS 890828 (2)TO'
GINN, INC.
Consulting Engineerst'T)
17103 Preston Road
Suite 100. LB-118
DALLAS, TEXAS 75248
(214) 2484900
WE ARE SENDING YOU [] Under separate cover via {'
the followinl; items:
[] Shop drawings
FI Copy of letter
FI Prints
[] Change order
[] Specifications
COPIES DATE NO. DESCRIPTION
I ? ,~,/J c~ /Y~. 7
THESE ARE TRANSMITTED as checked"below:
[].For approval J~pproved as submitted
J~r your use
[] As requested
[] For review and comment
[] FOR BIDS DUE
coPY ~o ~,C~'~
[] Approved as noted
[] Returned for corrections
[]
19
[] Resubmit
[] Submit ..
[] Return
copies for approval
copies for distribution
corrected prints
[] PRINTS RETURNED AFTER LOAN TO US
SIGNED:
If enclosures are not as noted, kindly not/f/us at once.
~us3olm
PROJECT
LOCATION
CONTRACTOR
REPORT OF FIELD CHANGE
SPECIAL REPORT NO.
PAoE/o../
DATE ~ - ~-e'
CROSS REFERENCE TO
DAILY REPORT NO.
INSTRUCTIONS
Whenever any corrective change is made in field construction which is at variance with the specifications and drawings as originally issued,
a complete detailed report Shell be filed, listing the following items, to That specifications or drawings storage data can be corrected. I. Identify the problem: Indicate why originally specified construction was not used.
2. The Solution: Describe, in detail, the recommended change or changes that were made, as applicable,
3. Indicate whether This is an isolated case or a general condition which could be improved by changing future specifications or drawings.
4. Submit sketches as necessary.
REFERENCE DATA
N,,.///,4- PAGE
SKETCH No. /Jf/JJ' DATED ENTITLED
DESCRIPTION
,. oETA,LEo,o..T..,cAT,o. oF T.E.Ro,,~.,.,
3. ,s T.E ,'.O"'E,., A. ,SO,.AT.D CASE O. Oe.E.A,.,
SUBMIT SKETCHES AS NECESSARY
(Attach extra sheets IS necessarY)
MCLEAN CONSTRUCTION
Utility Construction
AUG 2 8.J989_.
Mr. Gabe Favre
Ginn, Inc.
17103 Preston Rd., Suite 100, LB 118
Dallas, Texas 75248
,I
Re: 24" CrosstownWater line
Coppell, Tx.
Dear Mr. Favre:
The 8" Flush Assembly you requested at Station 62+63 on Line
'B' will consist of an 8" Gate Valve w/Box, an 8" 90° Bend.,
an 8" Cap and approximately 18 feet of 8" Ductile Iron Pipe.
Cost for this assembly is $925.00. Addition time extension
is two days and one hour.
Should you need more information please contact us.
Sincerly,
J. A. Watts