Loading...
WA8801-CS 890828 (2)TO' GINN, INC. Consulting Engineerst'T) 17103 Preston Road Suite 100. LB-118 DALLAS, TEXAS 75248 (214) 2484900 WE ARE SENDING YOU [] Under separate cover via {' the followinl; items: [] Shop drawings FI Copy of letter FI Prints [] Change order [] Specifications COPIES DATE NO. DESCRIPTION I ? ,~,/J c~ /Y~. 7 THESE ARE TRANSMITTED as checked"below: [].For approval J~pproved as submitted J~r your use [] As requested [] For review and comment [] FOR BIDS DUE coPY ~o ~,C~'~ [] Approved as noted [] Returned for corrections [] 19 [] Resubmit [] Submit .. [] Return copies for approval copies for distribution corrected prints [] PRINTS RETURNED AFTER LOAN TO US SIGNED: If enclosures are not as noted, kindly not/f/us at once. ~us3olm PROJECT LOCATION CONTRACTOR REPORT OF FIELD CHANGE SPECIAL REPORT NO. PAoE/o../ DATE ~ - ~-e' CROSS REFERENCE TO DAILY REPORT NO. INSTRUCTIONS Whenever any corrective change is made in field construction which is at variance with the specifications and drawings as originally issued, a complete detailed report Shell be filed, listing the following items, to That specifications or drawings storage data can be corrected. I. Identify the problem: Indicate why originally specified construction was not used. 2. The Solution: Describe, in detail, the recommended change or changes that were made, as applicable, 3. Indicate whether This is an isolated case or a general condition which could be improved by changing future specifications or drawings. 4. Submit sketches as necessary. REFERENCE DATA N,,.///,4- PAGE SKETCH No. /Jf/JJ' DATED ENTITLED DESCRIPTION ,. oETA,LEo,o..T..,cAT,o. oF T.E.Ro,,~.,., 3. ,s T.E ,'.O"'E,., A. ,SO,.AT.D CASE O. Oe.E.A,., SUBMIT SKETCHES AS NECESSARY (Attach extra sheets IS necessarY) MCLEAN CONSTRUCTION Utility Construction AUG 2 8.J989_. Mr. Gabe Favre Ginn, Inc. 17103 Preston Rd., Suite 100, LB 118 Dallas, Texas 75248 ,I Re: 24" CrosstownWater line Coppell, Tx. Dear Mr. Favre: The 8" Flush Assembly you requested at Station 62+63 on Line 'B' will consist of an 8" Gate Valve w/Box, an 8" 90° Bend., an 8" Cap and approximately 18 feet of 8" Ductile Iron Pipe. Cost for this assembly is $925.00. Addition time extension is two days and one hour. Should you need more information please contact us. Sincerly, J. A. Watts P.O. Box I1)'7,,'1'/· Killeen, Texas 7~5t,/'7· 817/634-5204 I'VE [ I