Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Enclaves-LR 950629
~. ~ CO~ULTING ENGINEERS ~~t nvir~ntst 3~K~ Soits & Foundations Construction#ateriats Testing .~cett~ebyEx~ri~ce" C~rciat & l~stria[ l~ction PO Box ~2548 * SouthLake, Texas 76092 * (817) ~-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE OF BREAK: 06-29-95 DAY: Thursday CLIENT: Wilbow Peck Corporation CONTRACTOR: Site Concrete CYL, SLUMP DATE OF DAYS I.D. LOCATION (IN.) S~MPLE AGED POUNDS PSI Enclave Ct: 2 C @ Station 3+00 5.25" 06-01-95 28 118,500 4192 2 D @ Station 3+00 5.25" 06-01-95 28 120,000 4245 3 C @ Station 1+00 5.0" 06-01-95 28 116,000 4103 3 D @ Station 1+00 5.0" 06-01-95 28 118,500 4192 SPECIFICATIONS: 3000 psi @ 28 days SUPPLIER: Pioneer Patrick Cor, bett Technician