Re Mockingbird Lane Reconstruction (Bethel School to Oriole) (2)Good afternoon, Keith! It's looking great and had been fairly painless! The work crews have been incredibly accommodating. I wanted to let you know that we have Meet the Teacher at Mockingbird from 5:00-6:00 PM on Thursday evening. Thanks! Pam Sent from my iPhone On Aug 16, 2013, at 11:02 AM, "Keith Marvin" <KMarvin@coppelltx.gov <mailto:KMarvin@coppelltx.gov> > wrote: With the start of school fast approaching, I wanted to give you all an update on our Mockingbird Lane reconstruction project. All of the concrete is in place for the paving and sidewalk. Over the course of the next week the contractor will be sealing, cleaning, striping and buttoning the street in preparation for restoring two-way traffic. Two-way traffic will be restored no later than Friday, August 23rd. We anticipate work continuing during the first week of school to restore sod and irrigation adjacent to the roadway, however this work will be scheduled to minimize any impact to the morning drop off and afternoon pick up at the two schools. Thank you for your patience and cooperation during this challenging reconstruction project. Should you have any questions about this project, or any other construction project in town, feel free to give me a call. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Keith Marvin Sent: Tuesday, June 04, 2013 10:11 AM To: 'Pam Mitchell'; mblevins@coppellisd.com <mailto:mblevins@coppellisd.com> ; 'lmacias@coppellisd.com <mailto:lmacias@coppellisd.com> '; 'jkennedy@coppellisd.com <mailto:jkennedy@coppellisd.com> '; 'npye@coppellisd.com <mailto:npye@coppellisd.com> '; 'lspringer@coppellisd.com <mailto:lspringer@coppellisd.com> '; 'bmcgill@coppellisd.com <mailto:bmcgill@coppellisd.com> '; Sid Grant; tringo@coppellisd.com <mailto:tringo@coppellisd.com> ; mpranske@gmail.com <mailto:mpranske@gmail.com> ; 'Lian Loop'; 'mmcvey@satpon.com <mailto:mmcvey@satpon.com> '; 'ehatcher@alum.trinity.edu <mailto:ehatcher@alum.trinity.edu> '; texasbuckeye@juno.com <mailto:texasbuckeye@juno.com> ; Buzz Walker (buzz_walker@hotmail.com <mailto:buzz_walker@hotmail.com> ); 'ldwens@cs.com <mailto:ldwens@cs.com> '; Dispatchers; Tim Oates; Eric Greaser; Mac Tristan; Kevin Richardson; Gregg Loyd; Tony Pletcher; James Cook Cc: Matt Atkins (Matt@JVolkConsulting.com <mailto:Matt@JVolkConsulting.com> ); Alberto Samaniego (asamaniego@coppelltx.gov <mailto:asamaniego@coppelltx.gov> ); Shane Huffman (shuffman_rkm@yahoo.com <mailto:shuffman_rkm@yahoo.com> ); Kenneth Griffin (kgriffin@coppelltx.gov <mailto:kgriffin@coppelltx.gov> ); Sharon Logan (slogan@coppelltx.gov <mailto:slogan@coppelltx.gov> ); Rhonda Adloo (RADLOO@coppelltx.gov <mailto:RADLOO@coppelltx.gov> ); Glenn Hollowell Subject: Mockingbird Lane Road Closure (Bethel School to Oriole) As most of you are aware, we have been working on the reconstruction of Mockingbird Lane for the last month. The contractor will be completing their utility tie-ins this week, and will begin the removal and replacement of the existing pavement on Monday, June 10th. Beginning on Monday, June 10th traffic on Mockingbird Lane will be restricted to one-way northbound from Bethel School Road to Oriole Lane. Please observe all traffic control signage and devices. Detour routes will be in place and signed for southbound through traffic. We apologize for the inconvenience this may cause you, however this will allow us to re-open the road to two-way traffic by the start of school on August 26th. Should you have any questions about this work, please feel free to call the construction inspector, Albert Samaniego at 469-576-1458, or I at the contact number below. Please help us get the word out by forwarding this information to your friends, neighbors, or co-workers. Thanks. Keith Marvin, P.E. City of Coppell 972-304-3681