Re Mockingbird Lane Reconstruction (Bethel School to Oriole) (2)Good afternoon, Keith!
It's looking great and had been fairly painless! The work crews have
been incredibly accommodating. I wanted to let you know that we have
Meet the Teacher at Mockingbird from 5:00-6:00 PM on Thursday evening.
Thanks!
Pam
Sent from my iPhone
On Aug 16, 2013, at 11:02 AM, "Keith Marvin" <KMarvin@coppelltx.gov
<mailto:KMarvin@coppelltx.gov> > wrote:
With the start of school fast approaching, I wanted to give you
all an update on our Mockingbird Lane reconstruction project.
All of the concrete is in place for the paving and sidewalk.
Over the course of the next week the contractor will be sealing,
cleaning, striping and buttoning the street in preparation for restoring
two-way traffic. Two-way traffic will be restored no later than Friday,
August 23rd.
We anticipate work continuing during the first week of school to
restore sod and irrigation adjacent to the roadway, however this work
will be scheduled to minimize any impact to the morning drop off and
afternoon pick up at the two schools.
Thank you for your patience and cooperation during this
challenging reconstruction project. Should you have any questions about
this project, or any other construction project in town, feel free to
give me a call.
Keith Marvin, P.E.
City of Coppell
972-304-3681
From: Keith Marvin
Sent: Tuesday, June 04, 2013 10:11 AM
To: 'Pam Mitchell'; mblevins@coppellisd.com
<mailto:mblevins@coppellisd.com> ; 'lmacias@coppellisd.com
<mailto:lmacias@coppellisd.com> '; 'jkennedy@coppellisd.com
<mailto:jkennedy@coppellisd.com> '; 'npye@coppellisd.com
<mailto:npye@coppellisd.com> '; 'lspringer@coppellisd.com
<mailto:lspringer@coppellisd.com> '; 'bmcgill@coppellisd.com
<mailto:bmcgill@coppellisd.com> '; Sid Grant; tringo@coppellisd.com
<mailto:tringo@coppellisd.com> ; mpranske@gmail.com
<mailto:mpranske@gmail.com> ; 'Lian Loop'; 'mmcvey@satpon.com
<mailto:mmcvey@satpon.com> '; 'ehatcher@alum.trinity.edu
<mailto:ehatcher@alum.trinity.edu> '; texasbuckeye@juno.com
<mailto:texasbuckeye@juno.com> ; Buzz Walker (buzz_walker@hotmail.com
<mailto:buzz_walker@hotmail.com> ); 'ldwens@cs.com
<mailto:ldwens@cs.com> '; Dispatchers; Tim Oates; Eric Greaser; Mac
Tristan; Kevin Richardson; Gregg Loyd; Tony Pletcher; James Cook
Cc: Matt Atkins (Matt@JVolkConsulting.com
<mailto:Matt@JVolkConsulting.com> ); Alberto Samaniego
(asamaniego@coppelltx.gov <mailto:asamaniego@coppelltx.gov> ); Shane
Huffman (shuffman_rkm@yahoo.com <mailto:shuffman_rkm@yahoo.com> );
Kenneth Griffin (kgriffin@coppelltx.gov <mailto:kgriffin@coppelltx.gov>
); Sharon Logan (slogan@coppelltx.gov <mailto:slogan@coppelltx.gov> );
Rhonda Adloo (RADLOO@coppelltx.gov <mailto:RADLOO@coppelltx.gov> );
Glenn Hollowell
Subject: Mockingbird Lane Road Closure (Bethel School to Oriole)
As most of you are aware, we have been working on the
reconstruction of Mockingbird Lane for the last month. The contractor
will be completing their utility tie-ins this week, and will begin the
removal and replacement of the existing pavement on Monday, June 10th.
Beginning on Monday, June 10th traffic on Mockingbird Lane will
be restricted to one-way northbound from Bethel School Road to Oriole
Lane. Please observe all traffic control signage and devices. Detour
routes will be in place and signed for southbound through traffic.
We apologize for the inconvenience this may cause you, however
this will allow us to re-open the road to two-way traffic by the start
of school on August 26th. Should you have any questions about this
work, please feel free to call the construction inspector, Albert
Samaniego at 469-576-1458, or I at the contact number below.
Please help us get the word out by forwarding this information
to your friends, neighbors, or co-workers.
Thanks.
Keith Marvin, P.E.
City of Coppell
972-304-3681