Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Enclaves-LR 950522
~ ~ CC""~ULTING ENGINEERS IN= · ~l~r~Q~e Environmental Assessments ~* Soits & Fou~ations Comtr~tion Naterials Testing "~ceLL~e by Ex~rie~e~m C~rciaL & l~stria[ Ins~cti~ ~ Box 925~ · S~th[ake, Texas 76~ · (817) ~-0~81 CONCRETE CYLINDER TEST RESULTS PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE OF BREAK: 05-22-95 DAY: Monday CLIENT: Wilbow Peck Corporation CONTRACTOR: Murray Construction CYL. SLUMP DATE OF DAYS I.D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Storm Sewer, Line B: i C @ Station 4+28 3.0" 04-24-95 28 142,000 5023 i D @ Station 4+28 3.0" 04-24-95 28 untestable SPECIFICATIONS: 4000 psi @ 28 days SUPPLIER: Mid-Cities Redi-Mix Chris Quentin Technician