Loading...
Enclaves-LR 950530 (2) 'GBO- /~ CO"~ULTING ENGINEERS IN= T~~J~e Environmental Assessments ~* SoiLs & Foundations Construction MateriaLs Testing "ExceLLence by Experience" Commercial & Industrial Inspection PO Box 92548 · Southtske, Texas 76092 · (817) $29-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 05-30-95 DAY: Tuesday TIME: 6:30am CLIENT: Wilbow Peck Corporation CONTRACTOR: Site Concrete WATER DRY PER- TEST ~ PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Enclave Ct: 1. @ Station 1+00 FG 3 23.0 95.5 95.1 2. @ Station 4+00 FG 3 22.1 99.1 98.7 3. @ Station 6+90 FG 3 22.9 96.1 95.7 RBMARKS: All tests passed. Minimum Compaction Required: 95% Minimum of 4 tests per trip. FG = Final Grade PROCTORS: 3. LT Brn & Tn Sandy Clay w/ Cal Nods 100.4 PCF @ 21.1% MOISTURE Jeff Holden Technician