Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Enclaves-LR 950501
~ '-~ C~'~OLTING EMGZMEERB ~r~Q~e Environmenta[ Assessments ~' Soils & Foundations Construction Materials Testing "ExceLLence byExperience,, Commercial & Industrial Inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 CONCRETE CYLINDER TEST RESULTS PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE OF BREAK: 05-01-95 DAY: Monday CLIENT: Wilbow Peck Corporation CONTRACTOR: Murray Construction CYL. SLUMP DATE OF DAYS I,D. LOCATION (IN.) SAMPLE AGED POUNDS PSI Storm Sewer, Line B: i A @ Station 4+28 3.0" 04-24-95 7 97,500 3449 1 B @ Station 4+28 3.0" 04-24-95 7 untestable SPECIFICATIONS: 4000 psi @ 28 days SUPPLIER: Mid-Cities Redi-Mix Chris Quentin Technician