Loading...
Enclaves-LR 950501 (2) ~ ~ C(~'"'~'ULT TN(] ENGZNEERS TB(~JI~IX~UBe Envi ronmentaL Assessments Z~ Soils & Foundations Construction HaterJats ?estJng "Exce[tence by Experience- Coe~nercJaL & Industrial Inspection PO Box 92548 · SouthLake, Texas ?6092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 05-01-95 DAY: Monday TIME: 12 noon CLIENT: Wilbow Peck Corporation CONTRACTOR: Murray Construction WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NOMBER (%) (PCF) COMP 8" Water .Line, Block A (south corner): 1. @ Lot 20 FG 1 18.6 107.0 99.5 2. @ Lot 17 FG I 19.6 105.2 97.9 3. @ Lot 16 FG I 17.8 102.6 95.4 4. @ Lot 15 FG 1 19.0 103.5 96.3 RBI(ARKB: All tests passed. Minimum Compaction Required: 95% FG = Final Grade PROCTORS: 1. Tan & Brown Sandy Clay 107.5 PCF @ 16.6% MOISTURE Chris Quentin Technician