Loading...
Enclaves-LR 950424 G~O- ~-- Cf~ULTING ENGINEERB ~~e Environmenta[ Assessments ~* Soits & Foundations Construction Materials Testing "ExceLLence byExperience,, Commercial & Industrial Inspection PO Box 92548 · South[eke, Texas 76092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 04-24-95 DAY: Monday TIME: 2:00pm CLIENT: Wilbow Peck Corporation CONTRACTOR: Murray Construction WATER DRY PER- TEBT PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Line B, 8" Water Line: 1. @ Station 1+00 FG 2 18.9 104.1 95.8 2. @ Station 3+00 FG 2 20.2 104.6 96.2 3. @ Station 5+00 FG 2 21.8 105.2 96.8 RRMARKB: All tests passed. Minimum Compaction Required: 95% No minimum of 4 tests per trip; tech on site for concrete pour. FG = Final Grade PROCTORS: 2. Tan & Brown Clay 108.7 PCF @ 18.4% MOISTURE Chris Quentin Technician