Loading...
Enclaves-LR 950425 G~O-' ~ C¢~'~'ULTING ENGINEERS · ~l~r~Q~e Environmental Assessments ~ Soits & Foundations Construction Nateria[s Testing "Exce[[ence byExperience- Commercial & Industrial Inspection PO Box 92548 · South[ake, Texas 76092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 04-25-95 DAY: Tuesday TIME: 10:00am CLIENT: Wilbow Peck Corporation CONTRACTOR: Murray Construction WATER DRY PER- TEST ~ PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Line B, 8" Water Line: 1. @ Station 5+50 FG 2 20.5 104.2 95.9 Water Service, Block A: 2. @ Lot 4 FG 2 18.2 103.3 95.0 3. @ Lot 13 FG 2 22.5 103.9 95.6 4. @ Lot 14 FG 2 20.2 105.1 96.7 5. @ Lot 15 FG 2 20.4 104.2 95.9 6. @ Lot 17 FG 2 18.4 104.5 96.1 REMARKS: All tests passed. Minimum Compaction Required: 95% FG = Final Grade Also picked up four (4) test cylinders made on 04-24-95. PROCTORS: 2. Tan & Brown Clay 108.7 PCF @ 18.4% MOISTURE Chris Quentin Technician