Loading...
Enclaves-LR 950401 GlO- ~-~ C(~u~ULTING ENGINEERS IN= · ~l~r~Que Environmentat Assessments Z~, Soits & Foundations Construction Materials Testing "Exce[[ence byExpecience" Commercial & Industrial Inspection PO aox 92548 · South[eke, Texas 76092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 04-01-95 DAY: Saturday TIME: lpm-3pm CLIENT: Wilbow Peck Corporation CONTRACTOR: Site Concrete WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP Block A: 1. @ Lot 2 4th Lift 1 18.7 105.8 98.4 2. @ Lot 4 4th Lift i 18.3 106.1 98.6 3. @ Lot 6 4th Lift i 19.5 103.9 96.6 4. @ Lot 8 4th Lift 1 18.2 104.8 97.4 REMARKS: Ail tests passed. Minimum Compaction Required: 95% PROCTORS: 1. Tan & Brown Sandy Clay 107.5 PCF @ 16.6% MOISTURE Jeff Holden Technician