Loading...
Enclaves-LR 950310 ~ ~ CO~ULTING ENGINEERS IN: I~(~r~e Environmental Assessments ~1~. SoiLs & Foundations Construction MateriaLs Testing "ExcetLencebyExperience- C~nerciaL & Industrial Inspection PO Box 92548 * Southtake, Texas 76092 · (817) ]29-0281 FIELD COMPACTION REPORT PROJECT: Enclave on the Parkway LOCATION: Coppell JOB #: 95-1340 DATE: 03-10-95 DAY: Friday TIME: ll:00am CLIENT: Wilbow Peck Corporation CONTRACTOR: Site Concrete WATER DRY PER- TEST PROCTOR CONT. DEN CENT NO. LOCATION AND LIFT NUMBER (%) (PCF) COMP 1. Northwest Quadrant 1st Lift 1 17.7 102.7 95.5 2. 100' S of Test $1 1st Lift 1 17.5 103.5 96.2 3. 50' E of Test $1 1st Lift i 18.0 102.4 95.2 4. 150' S of Test $3 1st Lift i 17.8 102.9 95.7 5. 100' S of Test $2 1st Lift 1 25.0 80.3 74.6* All tests passed, except Test $5 which failed due to high moisture. Minimum Compaction Required: 95% PROCTORS: 1. Tan & Brown Sandy Clay 107.5 PCF @ 16.6% MOISTURE Bill Zeeh Technician