RE Addenda - Northlake Dam (3)Keith-
You can add the statements John just sent to you to the end of my
previous answer to give the following response:
As indicated on Sheet C-15, the proposed excavation is for estimated
quantities, and adjustments may be necessary according to the quantity
of compacted fill needed. The proposed limits shown on Sheet C-15 may be
modified. However, the required minimum downstream slope on the saddle
dam is 5 horizontal to 1 vertical (5:1). The designated borrow sites are
required to be used. The estimated configuration of the borrow portions
of the embankments are to be adjusted as needed to provide the required
compacted fill, with approval of the final configuration by the
Engineer.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 1:43 PM
To: Patrick Miles
Cc: Jennifer Cook; John Rutledge
Subject: Re: Addenda - Northlake Dam
Haul off, or waste on site?
Keith Marvin
City of Coppell
On Nov 18, 2013, at 1:41 PM, "Patrick Miles" <jpm@freese.com
<mailto:jpm@freese.com> > wrote:
Keith-
While I don’t think we would run into that situation, you guys
can post the following answer to that question:
In response to Question #5, If we do not need the total amount
of borrow generated by this modification are we still required to
excavate to the limits shown and haul of any excess material.
As indicated on Sheet C-15, the proposed excavation is for
estimated quantities, and adjustments may be necessary according to the
quantity of compacted fill needed. The proposed limits shown on Sheet
C-15 may be modified. However, the required minimum downstream slope on
the saddle dam is 5 horizontal to 1 vertical (5:1).
Let me know if y’all need anything else. Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com
<image001.gif>
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 1:15 PM
To: Patrick Miles
Subject: Fwd: Addenda - Northlake Dam
Keith Marvin
City of Coppell
Begin forwarded message:
From: Jennifer Cook <Jenniferc@coppelltx.gov
<mailto:Jenniferc@coppelltx.gov> >
Date: November 18, 2013 at 1:10:41 PM CST
To: Keith Marvin <KMarvin@coppelltx.gov
<mailto:KMarvin@coppelltx.gov> >
Subject: RE: Addenda - Northlake Dam
Keith,
I just returned from lunch and had a queston posted on
Bidsync...
In response to Question #5, If we do not need the total
amount of borrow generated by this modification are we still required to
excavate to the limits shown and haul of any excess material.
Do you want me to post the answer in Q& A or add to the
addendum?
Thanks.
-----Original Message-----
From: Keith Marvin
Sent: Monday, November 18, 2013 12:45 PM
To: Jennifer Cook
Cc: John Rutledge; Patrick Miles
Subject: Re: Addenda - Northlake Dam
Jennifer,
Go ahead and post this addendum.
Patrick,
Please make sure you get this to the plan holders you
have issued plans to by 2:00pm.
Keith Marvin
City of Coppell
On Nov 18, 2013, at 12:34 PM, "Patrick Miles"
<jpm@freese.com <mailto:jpm@freese.com> > wrote:
See the attached PDF for Addendum No. 2. I've
also attached the Word file, though it doesn't include our structural
engineer's seal or the scanned drawings. Let me know if y'all need
anything else.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com <http://www.freese.com>
[Description:
cid:image001.gif@01CBB0E0.4E80AE10]
From: Patrick Miles
Sent: Monday, November 18, 2013 11:28 AM
To: 'Keith Marvin'
Cc: John Rutledge; Jennifer Cook
Subject: RE: Addenda - Northlake Dam
Alright. We'll get it all to you soon.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com <http://www.freese.com>
[Description:
cid:image001.gif@01CBB0E0.4E80AE10]
From: Keith Marvin
[mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 11:23 AM
To: Patrick Miles
Cc: John Rutledge; Jennifer Cook
Subject: Re: Addenda - Northlake Dam
Any official addenda will need to go out by 2:00
today.
Keith Marvin
City of Coppell
On Nov 18, 2013, at 11:09 AM, "Patrick Miles"
<jpm@freese.com <mailto:jpm@freese.com> <mailto:jpm@freese.com>> wrote:
Our structural engineer just came by with a
small change actually. He realized that the design of one of the
retaining walls was overly conservative and is working on modifying two
sheets in the drawings. We'll get the documentation drafted up and sent
over to you guys early afternoon.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com <http://www.freese.com>
<image001.gif>
From: Keith Marvin
[mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 11:07 AM
To: Patrick Miles; John Rutledge
Subject: Fwd: Addenda - Northlake Dam
Anything we need to send out?
Keith Marvin
City of Coppell
Begin forwarded message:
From: Jennifer Cook <Jenniferc@coppelltx.gov
<mailto:Jenniferc@coppelltx.gov> <mailto:Jenniferc@coppelltx.gov>>
Date: November 18, 2013 at 11:06:24 AM CST
To: Keith Marvin <KMarvin@coppelltx.gov
<mailto:KMarvin@coppelltx.gov> <mailto:KMarvin@coppelltx.gov>>
Subject: Addenda - Northlake Dam
Good morning,
Just want to follow-up - is there a need to post
a second addendum for Northlake?
Thanks.
Please consider the environment before printing
this message.
________________________________
This electronic mail message is intended
exclusively for the individual or entity to which it is addressed. This
message, together with any attachment, may contain the sender's
organization's confidential and privileged information. The recipient is
hereby notified to treat the information as confidential and privileged
and to not disclose or use the information except as authorized by
sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information
by persons or entities other than the intended recipient is prohibited.
If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any
computer. Thank you for your cooperation.
<image001.gif>
<CPL12252-AddendumNo2.pdf>
<CPL12252-AddendumNo2.docx>
se:
As indicated on Sheet C-15, the proposed excavation is for estimated
quantities, and adjustments may be necessary according to the quantity
of compacted fill needed. The proposed limits shown on Sheet C-15 may be
modified. However, the required minimum downstream slope on the saddle
dam is 5 horizontal to 1 vertical (5:1). The designated borrow sites are
required to be used. The estimated configuration of the borrow portions
of the embankments are to be adjusted as needed to provide the required
compacted fill, with approval of the final configuration by the
Engineer.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 1:43 PM
To: Patrick Miles
Cc: Jennifer Cook; John Rutledge
Subject: Re: Addenda - Northlake Dam
Haul off, or waste on site?
Keith Marvin
City of Coppell
On Nov 18, 2013, at 1:41 PM, "Patrick Miles" <jpm@freese.com
<mailto:jpm@freese.com> > wrote:
Keith-
While I don’t think we would run into that situation, you guys
can post the following answer to that question:
In response to Question #5, If we do not need the total amount
of borrow generated by this modification are we still required to
excavate to the limits shown and haul of any excess material.
As indicated on Sheet C-15, the proposed excavation is for
estimated quantities, and adjustments may be necessary according to the
quantity of compacted fill needed. The proposed limits shown on Sheet
C-15 may be modified. However, the required minimum downstream slope on
the saddle dam is 5 horizontal to 1 vertical (5:1).
Let me know if y’all need anything else. Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com
<image001.gif>
From: Keith Marvin [mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 1:15 PM
To: Patrick Miles
Subject: Fwd: Addenda - Northlake Dam
Keith Marvin
City of Coppell
Begin forwarded message:
From: Jennifer Cook <Jenniferc@coppelltx.gov
<mailto:Jenniferc@coppelltx.gov> >
Date: November 18, 2013 at 1:10:41 PM CST
To: Keith Marvin <KMarvin@coppelltx.gov
<mailto:KMarvin@coppelltx.gov> >
Subject: RE: Addenda - Northlake Dam
Keith,
I just returned from lunch and had a queston posted on
Bidsync...
In response to Question #5, If we do not need the total
amount of borrow generated by this modification are we still required to
excavate to the limits shown and haul of any excess material.
Do you want me to post the answer in Q& A or add to the
addendum?
Thanks.
-----Original Message-----
From: Keith Marvin
Sent: Monday, November 18, 2013 12:45 PM
To: Jennifer Cook
Cc: John Rutledge; Patrick Miles
Subject: Re: Addenda - Northlake Dam
Jennifer,
Go ahead and post this addendum.
Patrick,
Please make sure you get this to the plan holders you
have issued plans to by 2:00pm.
Keith Marvin
City of Coppell
On Nov 18, 2013, at 12:34 PM, "Patrick Miles"
<jpm@freese.com <mailto:jpm@freese.com> > wrote:
See the attached PDF for Addendum No. 2. I've
also attached the Word file, though it doesn't include our structural
engineer's seal or the scanned drawings. Let me know if y'all need
anything else.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com <http://www.freese.com>
[Description:
cid:image001.gif@01CBB0E0.4E80AE10]
From: Patrick Miles
Sent: Monday, November 18, 2013 11:28 AM
To: 'Keith Marvin'
Cc: John Rutledge; Jennifer Cook
Subject: RE: Addenda - Northlake Dam
Alright. We'll get it all to you soon.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com <http://www.freese.com>
[Description:
cid:image001.gif@01CBB0E0.4E80AE10]
From: Keith Marvin
[mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 11:23 AM
To: Patrick Miles
Cc: John Rutledge; Jennifer Cook
Subject: Re: Addenda - Northlake Dam
Any official addenda will need to go out by 2:00
today.
Keith Marvin
City of Coppell
On Nov 18, 2013, at 11:09 AM, "Patrick Miles"
<jpm@freese.com <mailto:jpm@freese.com> <mailto:jpm@freese.com>> wrote:
Our structural engineer just came by with a
small change actually. He realized that the design of one of the
retaining walls was overly conservative and is working on modifying two
sheets in the drawings. We'll get the documentation drafted up and sent
over to you guys early afternoon.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com <http://www.freese.com>
<image001.gif>
From: Keith Marvin
[mailto:KMarvin@coppelltx.gov]
Sent: Monday, November 18, 2013 11:07 AM
To: Patrick Miles; John Rutledge
Subject: Fwd: Addenda - Northlake Dam
Anything we need to send out?
Keith Marvin
City of Coppell
Begin forwarded message:
From: Jennifer Cook <Jenniferc@coppelltx.gov
<mailto:Jenniferc@coppelltx.gov> <mailto:Jenniferc@coppelltx.gov>>
Date: November 18, 2013 at 11:06:24 AM CST
To: Keith Marvin <KMarvin@coppelltx.gov
<mailto:KMarvin@coppelltx.gov> <mailto:KMarvin@coppelltx.gov>>
Subject: Addenda - Northlake Dam
Good morning,
Just want to follow-up - is there a need to post
a second addendum for Northlake?
Thanks.
Please consider the environment before printing
this message.
________________________________
This electronic mail message is intended
exclusively for the individual or entity to which it is addressed. This
message, together with any attachment, may contain the sender's
organization's confidential and privileged information. The recipient is
hereby notified to treat the information as confidential and privileged
and to not disclose or use the information except as authorized by
sender's organization. Any unauthorized review, printing, retention,
copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information
by persons or entities other than the intended recipient is prohibited.
If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any
computer. Thank you for your cooperation.
<image001.gif>
<CPL12252-AddendumNo2.pdf>
<CPL12252-AddendumNo2.docx>