RE RFI # 18John,
Archer Western will install a 6” concrete entrance at North Lake. It
will extend 20’ south from the existing road and have a 20’ radius on
both sides. We will use #5 rebar at 18” centers. There will be no flex
under the paving and we will drill and epoxy every 18” into the existing
curb.
Let me know if this is agreeable.
Michael