Loading...
RE Bid sync questions - NorthlakeHi, Keith- See below for our answers to the questions posted. John has reviewed these responses already as well. Let us know if you have any questions. Thanks. 1. Reference drawing #C-15 (17) is the work shown on this drawing required for this project or just if we need the borrow material? The work shown on Sheet C-15 is required and included under Pay Item #8 “Compacted Fill.” The proposed slopes and elevations are based on estimated calculations and may be adjusted to provide sufficient borrow material, as needed. This borrow material will be necessary for backfill over the spillway conduit and other excavated areas. Borrow costs are to be subsidiary to compacted fill costs. 2. Section 5 - Description of pay items #7 and #8. Addendum #1 included the backfill of the main dam (drawing C-16) with bid item #8. Please adjust bid quantity #7 to include the excavation of the main dam. Per out takeoff of this project the main dam excavation is not included in this bid item. Per Item #14 on page 1-11 we would not get paid for this excavation if this quantity is not adjusted. Based on the engineer’s calculations, the quantity of excavation on the main dam and the quantity of fill on the main dam have been optimized to achieve cut/fill balance. It is the intention of Pay Item #8 “Compacted Fill” that the excavation of material on the main dam would be considered borrow excavation for the fill on the main dam and is not an item of direct payment. Similar to the saddle dam on Sheet C-15, the grades shown for borrow are approximate. The grades shown for compacted fill are firm. Payment for all borrow excavation is intended to be included in the quantities for compacted fill. Also included in Pay Item #8 “Compacted Fill” is the backfill over the spillway conduit. Material for this fill quantity is intended to be borrowed from the saddle dam. Excavation on the saddle dam is also considered borrow excavation and not an item of direct payment. The excavation quantities in Pay Item #7 “Required Excavation” are intended to include only the excavation in the area of the new spillway and conduit. Patrick Miles, P.E. Water Resources Freese and Nichols, Inc. 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 817-735-7236 817-735-7483 fax www.freese.com From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, November 15, 2013 8:19 AM To: John Rutledge; Patrick Miles Cc: Jennifer Cook Subject: RE: Bid sync questions - Northlake John, If this doesn’t require a change to the documents, let’s just draft a response to the question, and Jennifer can post it to Bid Sync as an answer. Send me the response, and I’ll review it and get it to Jennifer to post. Thanks. Keith Marvin, P.E. Assistant Director of Public Works City of Coppell 972-304-3681 From: John Rutledge [mailto:JLR@freese.com] Sent: Friday, November 15, 2013 8:17 AM To: Keith Marvin; Patrick Miles Subject: RE: Bid sync questions - Northlake I had a voice mail with a similar question on the fill. May have been the same person. We covered that at the pre-bid, but there is obviously enough confusion that we should clarify it in writing. Since there is no change that I’m aware of we don’t need a formal addendum, but is that the best way to transmit the explanation? We’ll draft something up Thanks, John John Rutledge Freese and Nichols, Inc. 4055 International plaza, St 200 Fort Worth, TX 76109 (817) 735-7284 jlr@freese.com <mailto:jlr@freese.com> From: Keith Marvin [mailto:KMarvin@coppelltx.gov] Sent: Friday, November 15, 2013 8:07 AM To: Patrick Miles; John Rutledge Subject: FW: Bid sync questions - Northlake See below. Keith Marvin, P.E. Assistant Director of Public Works City of Coppell 972-304-3681 From: Jennifer Cook Sent: Friday, November 15, 2013 8:05 AM To: Keith Marvin Subject: Bid sync questions - Northlake Keith, These two questions came in through Bidsync this morning. Let me know If you want me to post the answers in Q&A or do an Addendum. If we do an addendum, I will need to post it no later than 2:00 on Monday (11/18). Thanks. 1. Reference drawing #C-15 (17) is the work shown on this drawing required for this project or just if we need the borrow material? 2. Section 5 - Description of pay items #7 and #8. Addendum #1 included the backfill of the main dam ( drawing C-16) with bid item #8. Please adjust bid quantity #7 to include the excavation of the main dam. Per out takeoff of this project the main dam excavation is not included in this bid item. Per Item #14 on page 1-11 we would not get paid for this excavation if this quantity is not adjusted. . Jennifer Cook I Purchasing Technician City of Coppell Town Center I 255 Parkway Blvd. I Coppell, TX 75019 o.972.304.3644 I f.972.304.3571 I e. jenniferc@coppelltx.gov <mailto:jenniferc@coppelltx.gov> Building Community through Public Service” Please consider the environment before printing this message. ________________________________ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. erver (TLS) id 8.3.279.1; Wed, 30 Oct 2013 09:39:27 -0500 Received: from mdcexmb02.tceh.net ([169.254.1.240]) by MDCPREXHTW01.tceh.net ([146.61.191.20]) with mapi; Wed, 30 Oct 2013 09:39:35 -0500 From: "Howe, James" <James.Howe@txu.com> To: "kmarvin@coppelltx.gov" <kmarvin@coppelltx.gov> Date: Wed, 30 Oct 2013 09:39:33 -0500 Subject: Cattle on Main Dam Thread-Topic: Cattle on Main Dam Thread-Index: Ac7VfaQqwIwKoprWRCeqf/abJGp6fw== Message-ID: <170FBC58F4FA3446A8BEE7F4FBB764911E0AC27873@MDCEXMB02.tceh.net> Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: X-MS-TNEF-Correlator: acceptlanguage: en-US Content-Type: multipart/alternative; boundary="_000_170FBC58F4FA3446A8BEE7F4FBB764911E0AC27873MDCEXMB02tceh_" MIME-Version: 1.0 Return-Path: James.Howe@txu.com X-FOPE-CONNECTOR: Id%0$Dn%*$RO%0$TLS%0$FQDN%$TlsDn% X-MS-Exchange-Organization-AuthSource: XCOPP.coppell.city X-MS-Exchange-Organization-AuthAs: Anonymous