Loading...
RE Cypress Waters - Lake Dam Lowering Grades (4)Michael and I talked on the phone and I recommended that we simply add 0.7’ to the BM that they are using. We now have 3 comparison: Spillway floor plan grade was 0.61’ low relative to record drawings. BM 6 is 0.81’ low BM 7 is 0.71’ low. I simply took the average of these as 0.7. Since Kimley Horn is using the BM 6 and BM7, this should put us in substantial agreement with them for their final development. If they want to survey in AW’s benchmark as a confirmation, that would likely be helpful, but up to them. We will reply to the RFI in this manner with a copy to Billingsleys. Please let me know if there is a reason to proceed differently. Thanks, John John Rutledge Freese and Nichols, Inc. 4055 International plaza, St 200 Fort Worth, TX 76109 (817) 735-7284 jlr@freese.com <mailto:jlr@freese.com> From: Suarez, Michael [mailto:msuarez@walshgroup.com] Sent: Monday, May 05, 2014 3:52 PM To: kmarvin@coppelltx.gov; John Rutledge; Kevin Sidebottom Cc: Kinder, Asa Subject: RE: Cypress Waters - Lake Dam Lowering Grades Here are the updated values. I typed in the BM # 7 incorrectly. From: Suarez, Michael Sent: Monday, May 05, 2014 3:33 PM To: kmarvin@coppelltx.gov <mailto:kmarvin@coppelltx.gov> ; John Rutledge (JLR@freese.com <mailto:JLR@freese.com> ); kps@freese.com <mailto:kps@freese.com> Cc: Kinder, Asa Subject: FW: Cypress Waters - Lake Dam Lowering Grades Keith, We shot BM # 6 and BM #7 and using the elevation shown for the BM on the oil trap this is what we got. BM # 6 Per Kimley-Horn= 518.90’ We shot = 518.09’ Difference 0.81’ BM # 7 Per Kimley-Horn = 510.73’ We shot = 510.02’ Difference = .71’ We look to be about 9 to 10 inches lower than Billingsley. We were using our GPS which is plus or minus .10’. We need to know ASAP what elevation you want us to use as we are bottoming out for our footings today. Michael From: stacy.dunn@kimley-horn.com <mailto:stacy.dunn@kimley-horn.com> [mailto:stacy.dunn@kimley-horn.com] Sent: Monday, May 05, 2014 8:38 AM To: Suarez, Michael; SJones@Billingsleyco.com <mailto:SJones@Billingsleyco.com> ; brad.moss@kimley-horn.com <mailto:brad.moss@kimley-horn.com> Cc: kmarvin@coppelltx.gov <mailto:kmarvin@coppelltx.gov> ; BWalker@Billingsleyco.com <mailto:BWalker@Billingsleyco.com> Subject: RE: Cypress Waters - Lake Dam Lowering Grades Michael, I have attached our bench marks as requested. Let me know if you need anything else. The electronic data files ("Files") furnished herewith by Kimley-Horn and Associates, Inc. to your firm, "Archer Western Contractors", for "Cypress Waters, Dallas Tx" are provided solely for your convenience, at the request of our client, "Billingsley Company". By requesting this data, your firm expressly agrees that any use of the information obtained or derived from the files provided in the attachment(s) will be at "your firm's" own risk. Further, the RPLS at "your firm" using said data, in any way, shall be bound by the Rules demanded by the TBPLS. By requesting and receiving said information, "your firm" accepts the Files on an "as is" basis with all faults. There are no express warranties made by Kimley-Horn with respect to the Files, and any implied warranties are excluded. Thank you, Stacy From: Suarez, Michael [mailto:msuarez@walshgroup.com] Sent: Monday, May 05, 2014 8:03 AM To: Steve Jones; Moss, Brad; Dunn, Stacy Cc: Keith Marvin ; Bill Walker Subject: RE: Cypress Waters - Lake Dam Lowering Grades Steve, As I understand it from the meeting, Coppell would like the benchmarks from your surveyor so they can have their surveying crew check in with the ones we are using to set the intake structure. Stacy- Can you provide this information? Michael Suarez Project Manager Archer Western Contractors Cell (817) 819-2073 msuarez@walshgroup.com <mailto:msuarez@archerwestern.com> From: Steve Jones [mailto:SJones@Billingsleyco.com] Sent: Thursday, May 01, 2014 6:30 PM To: Brad Moss (brad.moss@kimley-horn.com <mailto:brad.moss@kimley-horn.com> ); stacy.dunn@kimley-horn.com <mailto:stacy.dunn@kimley-horn.com> Cc: Keith Marvin ; Bill Walker; Suarez, Michael Subject: Cypress Waters - Lake Dam Lowering Grades Importance: High Brad/Stacy: During the North Lake Dam Lowering Progress Meeting today with Archer Western and Freese & Nichols, a 6” bench mark issue with Contour & Lake Level Elevations was identified that needs verification so everyone is on the same datum. Please contact Michael Suarez (817) 819-2073 to compare Bench Mark details, etc. Please keep us in the loop. Thanks. H. Stephen “Steve” Jones, AIA Project Management Cell: 214-676-7451 One Arts Plaza | 1722 Routh Street, Suite 1313 | Dallas, Texas 75201 |214-270-0989 <http://www.billingsleyco.com/> We Partner in Creating Life—Enhancing Communities ________________________________ The information contained in this transmission may be privileged and confidential and is intended only for the use of the person(s) named above. If you are not the intended recipient, or an employee or agent responsible for delivering this message to the intended recipient, any review, dissemination, distribution or duplication of this communication is strictly prohibited. This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. vin@coppelltx.gov</a>; John Rutledge (<a href="mailto:JLR@freese.com">JLR@freese.com</a>); <a href="mailto:kps@freese.com">kps@freese.com</a><br> <b>Cc:</b> Kinder, Asa<br> <b>Subject:</b> FW: Cypress Waters - Lake Dam Lowering Grades<o:p></o:p></span></p> </div> </div> <p class="MsoNormal"><o:p>&nbsp;</o:p></p> <p class="MsoNormal"><span style="color:#1F497D">Keith,<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">We shot BM # 6 and BM #7 and using the elevation shown for the BM on the oil trap this is what we got.<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">BM # 6<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Per Kimley-Horn= 518.90’<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">We shot = 518.09’<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Difference 0.81’<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">BM # 7<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Per Kimley-Horn = 510.73’<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D;background:yellow;mso-highlight:yellow">We shot = 510.02’</span><span style="color:#1F497D"><o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Difference = .71’<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">We look to be about 9 to 10 inches lower than Billingsley.&nbsp; We were using our GPS which is plus or minus .10’.<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">We need to know ASAP what elevation you want us to use as we are bottoming out for our footings today.<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Michael <o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <div> <div style="border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in"> <p class="MsoNormal"><b><span style="font-size:10.0pt;font-family:&quot;Tahoma&quot;,&quot;sans-serif&quot;">From:</span></b><span style="font-size:10.0pt;font-family:&quot;Tahoma&quot;,&quot;sans-se rif&quot;"> <a href="mailto:stacy.dunn@kimley-horn.com">stacy.dunn@kimley-horn.com</a> [<a href="mailto:stacy.dunn@kimley-horn.com">mailto:stacy.dunn@kimley-horn.com</a>] <br> <b>Sent:</b> Monday, May 05, 2014 8:38 AM<br> <b>To:</b> Suarez, Michael; <a href="mailto:SJones@Billingsleyco.com">SJones@Billingsleyco.com</a>; <a href="mailto:brad.moss@kimley-horn.com">brad.moss@kimley-horn.com</a><br> <b>Cc:</b> <a href="mailto:kmarvin@coppelltx.gov">kmarvin@coppelltx.gov</a>; <a href="mailto:BWalker@Billingsleyco.com"> BWalker@Billingsleyco.com</a><br> <b>Subject:</b> RE: Cypress Waters - Lake Dam Lowering Grades<o:p></o:p></span></p> </div> </div> <p class="MsoNormal"><o:p>&nbsp;</o:p></p> <p class="MsoNormal"><span style="color:#1F497D">Michael,<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">I have attached our bench marks as requested.&nbsp; Let me know if you need anything else.<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">The electronic data files (&quot;Files&quot;) furnished herewith by Kimley-Horn and Associates, Inc. to your firm, &quot;Archer Western Contractors&quot;, for &quot;Cypress Waters, Dallas Tx&quot; are provided solely for your convenience, at the request of our client, &quot;Billingsley Company&quot;.&nbsp; By requesting this data, your firm expressly agrees that any use of the information obtained or derived from the files provided in the attachment(s) will be at &quot;your firm's&quot; own risk.&nbsp; Further, the RPLS at &quot;your firm&quot; using said data, in any way, shall be bound by the Rules demanded by the TBPLS.&nbsp; By requesting and receiving said information, &quot;your firm&quot; accepts the Files on an &quot;as is&quot; basis with all faults.&nbsp; There are no express warranties made by Kimley-Horn with respect to the Files, and any implied warranties are excluded.<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Thank you,<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Stacy<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <div> <div style="border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in"> <p class="MsoNormal"><b><span style="font-size:10.0pt;font-family:&quot;Tahoma&quot;,&quot;sans-serif&quot;">From:</span></b><span style="font-size:10.0pt;font-family:&quot;Tahoma&quot;,&quot;sans-se rif&quot;"> Suarez, Michael [<a href="mailto:msuarez@walshgroup.com">mailto:msuarez@walshgroup.com</a>] <br> <b>Sent:</b> Monday, May 05, 2014 8:03 AM<br> <b>To:</b> Steve Jones; Moss, Brad; Dunn, Stacy<br> <b>Cc:</b> Keith Marvin ; Bill Walker<br> <b>Subject:</b> RE: Cypress Waters - Lake Dam Lowering Grades<o:p></o:p></span></p> </div> </div> <p class="MsoNormal"><o:p>&nbsp;</o:p></p> <p class="MsoNormal"><span style="color:#1F497D">Steve,<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">As I understand it from the meeting, Coppell would like the benchmarks from your surveyor so they can have their surveying crew check in with the ones we are using to set the intake structure.<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D">Stacy- Can you provide this information?<o:p></o:p></span></p> <p class="MsoNormal"><span style="color:#1F497D"><o:p>&nbsp;</o:p></span></p> <p class="MsoNo