RE Cypress Waters - Lake Dam Lowering Grades (4)Michael and I talked on the phone and I recommended that we simply add
0.7’ to the BM that they are using. We now have 3 comparison:
Spillway floor plan grade was 0.61’ low relative to record drawings.
BM 6 is 0.81’ low
BM 7 is 0.71’ low.
I simply took the average of these as 0.7. Since Kimley Horn is using
the BM 6 and BM7, this should put us in substantial agreement with them
for their final development. If they want to survey in AW’s benchmark as
a confirmation, that would likely be helpful, but up to them.
We will reply to the RFI in this manner with a copy to Billingsleys.
Please let me know if there is a reason to proceed differently.
Thanks,
John
John Rutledge
Freese and Nichols, Inc.
4055 International plaza, St 200
Fort Worth, TX 76109
(817) 735-7284
jlr@freese.com <mailto:jlr@freese.com>
From: Suarez, Michael [mailto:msuarez@walshgroup.com]
Sent: Monday, May 05, 2014 3:52 PM
To: kmarvin@coppelltx.gov; John Rutledge; Kevin Sidebottom
Cc: Kinder, Asa
Subject: RE: Cypress Waters - Lake Dam Lowering Grades
Here are the updated values. I typed in the BM # 7 incorrectly.
From: Suarez, Michael
Sent: Monday, May 05, 2014 3:33 PM
To: kmarvin@coppelltx.gov <mailto:kmarvin@coppelltx.gov> ; John
Rutledge (JLR@freese.com <mailto:JLR@freese.com> ); kps@freese.com
<mailto:kps@freese.com>
Cc: Kinder, Asa
Subject: FW: Cypress Waters - Lake Dam Lowering Grades
Keith,
We shot BM # 6 and BM #7 and using the elevation shown for the BM on
the oil trap this is what we got.
BM # 6
Per Kimley-Horn= 518.90’
We shot = 518.09’
Difference 0.81’
BM # 7
Per Kimley-Horn = 510.73’
We shot = 510.02’
Difference = .71’
We look to be about 9 to 10 inches lower than Billingsley. We were
using our GPS which is plus or minus .10’.
We need to know ASAP what elevation you want us to use as we are
bottoming out for our footings today.
Michael
From: stacy.dunn@kimley-horn.com <mailto:stacy.dunn@kimley-horn.com>
[mailto:stacy.dunn@kimley-horn.com]
Sent: Monday, May 05, 2014 8:38 AM
To: Suarez, Michael; SJones@Billingsleyco.com
<mailto:SJones@Billingsleyco.com> ; brad.moss@kimley-horn.com
<mailto:brad.moss@kimley-horn.com>
Cc: kmarvin@coppelltx.gov <mailto:kmarvin@coppelltx.gov> ;
BWalker@Billingsleyco.com <mailto:BWalker@Billingsleyco.com>
Subject: RE: Cypress Waters - Lake Dam Lowering Grades
Michael,
I have attached our bench marks as requested. Let me know if you need
anything else.
The electronic data files ("Files") furnished herewith by Kimley-Horn
and Associates, Inc. to your firm, "Archer Western Contractors", for
"Cypress Waters, Dallas Tx" are provided solely for your convenience, at
the request of our client, "Billingsley Company". By requesting this
data, your firm expressly agrees that any use of the information
obtained or derived from the files provided in the attachment(s) will be
at "your firm's" own risk. Further, the RPLS at "your firm" using said
data, in any way, shall be bound by the Rules demanded by the TBPLS. By
requesting and receiving said information, "your firm" accepts the Files
on an "as is" basis with all faults. There are no express warranties
made by Kimley-Horn with respect to the Files, and any implied
warranties are excluded.
Thank you,
Stacy
From: Suarez, Michael [mailto:msuarez@walshgroup.com]
Sent: Monday, May 05, 2014 8:03 AM
To: Steve Jones; Moss, Brad; Dunn, Stacy
Cc: Keith Marvin ; Bill Walker
Subject: RE: Cypress Waters - Lake Dam Lowering Grades
Steve,
As I understand it from the meeting, Coppell would like the benchmarks
from your surveyor so they can have their surveying crew check in with
the ones we are using to set the intake structure.
Stacy- Can you provide this information?
Michael Suarez
Project Manager
Archer Western Contractors
Cell (817) 819-2073
msuarez@walshgroup.com <mailto:msuarez@archerwestern.com>
From: Steve Jones [mailto:SJones@Billingsleyco.com]
Sent: Thursday, May 01, 2014 6:30 PM
To: Brad Moss (brad.moss@kimley-horn.com
<mailto:brad.moss@kimley-horn.com> ); stacy.dunn@kimley-horn.com
<mailto:stacy.dunn@kimley-horn.com>
Cc: Keith Marvin ; Bill Walker; Suarez, Michael
Subject: Cypress Waters - Lake Dam Lowering Grades
Importance: High
Brad/Stacy:
During the North Lake Dam Lowering Progress Meeting today with Archer
Western and Freese & Nichols, a 6” bench mark issue with Contour & Lake
Level Elevations was identified that needs verification so everyone is
on the same datum.
Please contact Michael Suarez (817) 819-2073 to compare Bench Mark
details, etc.
Please keep us in the loop.
Thanks.
H. Stephen “Steve” Jones, AIA
Project Management
Cell: 214-676-7451
One Arts Plaza | 1722 Routh Street, Suite 1313 | Dallas, Texas 75201
|214-270-0989
<http://www.billingsleyco.com/>
We Partner in Creating Life—Enhancing Communities
________________________________
The information contained in this transmission may be privileged and
confidential and is intended only for the use of the
person(s) named above. If you are not the intended recipient, or an
employee or agent responsible for delivering this message to
the intended recipient, any review, dissemination, distribution or
duplication of this communication is strictly prohibited.
This electronic mail message is intended exclusively for the individual
or entity to which it is addressed. This message, together with any
attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the
information as confidential and privileged and to not disclose or use
the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure,
distribution, retransmission, dissemination or other use of, or taking
of any action in reliance upon, this information by persons or entities
other than the intended recipient is prohibited. If you received this
message in error, please immediately contact the sender by reply email
and delete all copies of the material from any computer. Thank you for
your cooperation.
vin@coppelltx.gov</a>; John Rutledge (<a href="mailto:JLR@freese.com">JLR@freese.com</a>);
<a href="mailto:kps@freese.com">kps@freese.com</a><br>
<b>Cc:</b> Kinder, Asa<br>
<b>Subject:</b> FW: Cypress Waters - Lake Dam Lowering Grades<o:p></o:p></span></p>
</div>
</div>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal"><span style="color:#1F497D">Keith,<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">We shot BM # 6 and BM #7 and using the elevation shown for the BM on the oil trap this is what we got.<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">BM # 6<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Per Kimley-Horn= 518.90’<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">We shot = 518.09’<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Difference 0.81’<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">BM # 7<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Per Kimley-Horn = 510.73’<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D;background:yellow;mso-highlight:yellow">We shot = 510.02’</span><span style="color:#1F497D"><o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Difference = .71’<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">We look to be about 9 to 10 inches lower than Billingsley. We were using our GPS which is plus or minus .10’.<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">We need to know ASAP what elevation you want us to use as we are bottoming out for our footings today.<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Michael <o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<div>
<div style="border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in">
<p class="MsoNormal"><b><span style="font-size:10.0pt;font-family:"Tahoma","sans-serif"">From:</span></b><span style="font-size:10.0pt;font-family:"Tahoma","sans-se
rif"">
<a href="mailto:stacy.dunn@kimley-horn.com">stacy.dunn@kimley-horn.com</a> [<a href="mailto:stacy.dunn@kimley-horn.com">mailto:stacy.dunn@kimley-horn.com</a>]
<br>
<b>Sent:</b> Monday, May 05, 2014 8:38 AM<br>
<b>To:</b> Suarez, Michael; <a href="mailto:SJones@Billingsleyco.com">SJones@Billingsleyco.com</a>;
<a href="mailto:brad.moss@kimley-horn.com">brad.moss@kimley-horn.com</a><br>
<b>Cc:</b> <a href="mailto:kmarvin@coppelltx.gov">kmarvin@coppelltx.gov</a>; <a href="mailto:BWalker@Billingsleyco.com">
BWalker@Billingsleyco.com</a><br>
<b>Subject:</b> RE: Cypress Waters - Lake Dam Lowering Grades<o:p></o:p></span></p>
</div>
</div>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal"><span style="color:#1F497D">Michael,<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">I have attached our bench marks as requested. Let me know if you need anything else.<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">The electronic data files ("Files") furnished herewith by Kimley-Horn and Associates, Inc. to your firm, "Archer Western
Contractors", for "Cypress Waters, Dallas Tx" are provided solely for your convenience,
at the request of our client, "Billingsley Company". By requesting this data, your firm expressly agrees that any use of the information obtained or derived from the
files provided in the attachment(s) will be at "your firm's" own risk. Further, the RPLS
at "your firm" using said data, in any way, shall be bound by the Rules demanded by the TBPLS. By requesting and receiving said information, "your firm" accepts
the Files on an "as is" basis with all faults. There are no express warranties made by Kimley-Horn
with respect to the Files, and any implied warranties are excluded.<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Thank you,<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Stacy<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<div>
<div style="border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in">
<p class="MsoNormal"><b><span style="font-size:10.0pt;font-family:"Tahoma","sans-serif"">From:</span></b><span style="font-size:10.0pt;font-family:"Tahoma","sans-se
rif""> Suarez, Michael [<a href="mailto:msuarez@walshgroup.com">mailto:msuarez@walshgroup.com</a>]
<br>
<b>Sent:</b> Monday, May 05, 2014 8:03 AM<br>
<b>To:</b> Steve Jones; Moss, Brad; Dunn, Stacy<br>
<b>Cc:</b> Keith Marvin ; Bill Walker<br>
<b>Subject:</b> RE: Cypress Waters - Lake Dam Lowering Grades<o:p></o:p></span></p>
</div>
</div>
<p class="MsoNormal"><o:p> </o:p></p>
<p class="MsoNormal"><span style="color:#1F497D">Steve,<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">As I understand it from the meeting, Coppell would like the benchmarks from your surveyor so they can have their surveying crew check
in with the ones we are using to set the intake structure.<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D">Stacy- Can you provide this information?<o:p></o:p></span></p>
<p class="MsoNormal"><span style="color:#1F497D"><o:p> </o:p></span></p>
<p class="MsoNo