Loading...
Enclaves-CS 940117January 17, 1994 Mr. Glen Brovont Jonas Associates Limited Partnership 11615 Forest Central Suite 100 Dallas, TX 75243 RE: Marks Apartments Development Fee Assessment Dear Mr. Brovont: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Marks Apartments. Please provide a check made payable to the City of Coppell in the amount of $126,670.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: January 17, 1994 Project: Marks Apartments TOTAL AMOUNT DUE ASSESSMENT PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 35,750.00 $ 35,750.00 (100% due prior to Council Approval) Water Tap Inspection Fee $ 200.00 -0- (100%due at Issuance of Building Permi0 Wastewater Impact Fee $11,250.00 $11,250.00 (100% due prior to Council Approval) Utility Final Inspection Fee $ 50.00 -O- (100%due at Issuance of Building Permit) Water Meter Fee (Lots) $10,340.80 -0- (100%due at Issuance of Building Permit) Water Meter Deposit $ 70.00 -0- (100%due at Issuance of Building Permit) Street Light Fee * (100%due prior to Acceptance of Project) Park Fee $159,340.00 $ 79,670.00 (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL $ 217,000.80 TOTAL AMOUNT DUE PRIOR TO $126,670.00 COUNCIL APPROVAL + Construction Inspection Fee (2% of Project Cost due prior to preconstmction meeting) * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: January 10, 1994 TO: Ken Griffin, P.E., City Engineer FROM: Howard L. Pafford, Utilities Superintende RE: Irrigation Fees for Marks Apartments The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 2 - 4" Domestic/Irrigation Meter/s = 50 ESU's 2 - 8" Fire Meter/s = 5 ESU's Total 55 ESU's @ $650.00 ea = $35,750.00 100% due prior to Council approval of the final plat. Wastewater Impact (MUD) 2 - 4" Residential Meters = 50 ESU's Total 50 ESU's @ $225.00 ea = $11,250.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $100.00 each = $200.00 100% due prior to issuance of meter/s. Utility Final Inspection Fee 1 lot @ $50.00/lot = $50.00 Water Meter Fee (Lots) 2 - 8 x 4" MFM/MCT Residential Meters @ $5,170.40 = $10,340.80 100% due prior to issuance of building permit. Water Meter Deposit 2 meters @ $35.00 ea = $70.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Park Fee Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ For those developments having preliminary plat approval after October 26, 1993, the following assessment is determined: Residential lots at $1,285.00 ea = $ 124 Units (Multi-Family) at $1,285.00 ea = $159,340.00 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments, please advise. HLP/dm cc: Steven G. Goram Director of Public Works STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 n/a Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 OTHER No Outlet (30"; $65.12 No Outlet Blade $11.60 TOTAL ~ 0~ * Cost breakdowns may be obtained from Public Works by written request. FEES.HLP/MARKSAPT