Loading...
FW Cypress Waters - Lake Dam Lowering GradesKeith, We shot BM # 6 and BM #7 and using the elevation shown for the BM on the oil trap this is what we got. BM # 6 Per Kimley-Horn= 518.90’ We shot = 518.09’ Difference 0.81’ BM # 7 Per Kimley-Horn = 510.73’ We shot = 510.20’ Difference = .71’ We look to be about 9 to 10 inches lower than Billingsley. We were using our GPS which is plus or minus .10’. We need to know ASAP what elevation you want us to use as we are bottoming out for our footings today. Michael From: stacy.dunn@kimley-horn.com [mailto:stacy.dunn@kimley-horn.com] Sent: Monday, May 05, 2014 8:38 AM To: Suarez, Michael; SJones@Billingsleyco.com; brad.moss@kimley-horn.com Cc: kmarvin@coppelltx.gov; BWalker@Billingsleyco.com Subject: RE: Cypress Waters - Lake Dam Lowering Grades Michael, I have attached our bench marks as requested. Let me know if you need anything else. The electronic data files ("Files") furnished herewith by Kimley-Horn and Associates, Inc. to your firm, "Archer Western Contractors", for "Cypress Waters, Dallas Tx" are provided solely for your convenience, at the request of our client, "Billingsley Company". By requesting this data, your firm expressly agrees that any use of the information obtained or derived from the files provided in the attachment(s) will be at "your firm's" own risk. Further, the RPLS at "your firm" using said data, in any way, shall be bound by the Rules demanded by the TBPLS. By requesting and receiving said information, "your firm" accepts the Files on an "as is" basis with all faults. There are no express warranties made by Kimley-Horn with respect to the Files, and any implied warranties are excluded. Thank you, Stacy From: Suarez, Michael [mailto:msuarez@walshgroup.com] Sent: Monday, May 05, 2014 8:03 AM To: Steve Jones; Moss, Brad; Dunn, Stacy Cc: Keith Marvin ; Bill Walker Subject: RE: Cypress Waters - Lake Dam Lowering Grades Steve, As I understand it from the meeting, Coppell would like the benchmarks from your surveyor so they can have their surveying crew check in with the ones we are using to set the intake structure. Stacy- Can you provide this information? Michael Suarez Project Manager Archer Western Contractors Cell (817) 819-2073 msuarez@walshgroup.com <mailto:msuarez@archerwestern.com> From: Steve Jones [mailto:SJones@Billingsleyco.com] Sent: Thursday, May 01, 2014 6:30 PM To: Brad Moss (brad.moss@kimley-horn.com <mailto:brad.moss@kimley-horn.com> ); stacy.dunn@kimley-horn.com <mailto:stacy.dunn@kimley-horn.com> Cc: Keith Marvin ; Bill Walker; Suarez, Michael Subject: Cypress Waters - Lake Dam Lowering Grades Importance: High Brad/Stacy: During the North Lake Dam Lowering Progress Meeting today with Archer Western and Freese & Nichols, a 6” bench mark issue with Contour & Lake Level Elevations was identified that needs verification so everyone is on the same datum. Please contact Michael Suarez (817) 819-2073 to compare Bench Mark details, etc. Please keep us in the loop. Thanks. H. Stephen “Steve” Jones, AIA Project Management Cell: 214-676-7451 One Arts Plaza | 1722 Routh Street, Suite 1313 | Dallas, Texas 75201 |214-270-0989 <http://www.billingsleyco.com/> We Partner in Creating Life—Enhancing Communities ________________________________ The information contained in this transmission may be privileged and confidential and is intended only for the use of the person(s) named above. If you are not the intended recipient, or an employee or agent responsible for delivering this message to the intended recipient, any review, dissemination, distribution or duplication of this communication is strictly prohibited.