North Lake Dam -- Sheet S-2All-
I apologize for the confusion we’ve had regarding the missing Sheet S-2
in the Issued for Construction drawing set. The attached PDFs are the
Half Size and Full Size copies of Sheet S-2. Somehow the PDF of this
sheet did not get included in the full set when it went to print. We
will bring copies of these sheets with us to distribute at the monthly
progress meeting next week. Feel free to use these PDFs as reference
until then.
Keith, if the City would like to stamp these sheets with the “Approved
for Conformance” stamp, please let us know if we need to bring them by
your office ahead of time or how you’d like to proceed.
Thanks.
Patrick Miles, P.E.
Water Resources
Freese and Nichols, Inc.
4055 International Plaza, Suite 200
Fort Worth, Texas 76109
817-735-7236
817-735-7483 fax
www.freese.com
Please consider the environment before printing this message.
This electronic mail message is intended exclusively for the individual
or entity to which it is addressed. This message, together with any
attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the
information as confidential and privileged and to not disclose or use
the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure,
distribution, retransmission, dissemination or other use of, or taking
of any action in reliance upon, this information by persons or entities
other than the intended recipient is prohibited. If you received this
message in error, please immediately contact the sender by reply email
and delete all copies of the material from any computer. Thank you for
your cooperation.