FW Unit A2 Toe wall and rip rapKeith, Attached is the Executed Change Order #2 for the Unit A2 Toe Wall and rip rap. Two originals will be sent via post to: City of Coppell, ATTN: Keith Marvin, 255 Parkway BLVD, Coppell, Texas 75019. Please advise if the address is incorrect. Thank you, Marie Castellon JDK Associates, Inc. Contracts Administrator 940-686-6236 940-686-6318 Grace and Peace To You!! From: Steve Kenney [mailto:steve@jdkassoc.com <mailto:steve@jdkassoc.com> ] Sent: Friday, October 25, 2013 8:07 AM To: Marie Castellon Subject: Fwd: Unit A2 Toe wall and rip rap Print Sent from my iPhone Begin forwarded message: From: Keith Marvin <KMarvin@coppelltx.gov <mailto:KMarvin@coppelltx.gov> > Date: October 25, 2013 at 8:05:29 AM CDT To: Steve Kenney <steve@jdkassoc.com <mailto:steve@jdkassoc.com> > Cc: Alberto Samaniego <ASamaniego@coppelltx.gov <mailto:ASamaniego@coppelltx.gov> >, Kyra Cody <KCody@coppelltx.gov <mailto:KCody@coppelltx.gov> >, John Elias <JElias@coppelltx.gov <mailto:JElias@coppelltx.gov> > Subject: RE: Unit A2 Toe wall and rip rap Steve, Please review the attached change order number 2. If it looks good to you, please sign and return 2 originals. This Change Order is for the full price of the spillway, we can handle the deduct pricing on the next pay request. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Thursday, October 24, 2013 2:46 PM To: Keith Marvin Subject: Re: Unit A2 Toe wall and rip rap Ok thanks Sent from my iPhone On Oct 24, 2013, at 2:44 PM, Keith Marvin <KMarvin@coppelltx.gov <mailto:KMarvin@coppelltx.gov> > wrote: Steve, Go ahead and proceed with this work. I will prepare the change order for approval. Keith Marvin, P.E. City of Coppell 972-304-3681 From: Steve Kenney [mailto:steve@jdkassoc.com] Sent: Thursday, October 24, 2013 2:27 PM To: Keith Marvin; asamaniego@coppelltx.gox <mailto:asamaniego@coppelltx.gox> Subject: Unit A2 Toe wall and rip rap Keith, We can get the toe wall and rip rap at the spill way do for: 1. Wall 50’L x 6’T x 1’W 2. Remove and replace Rip rap with existing and new 3. Rebuild small natural stone wall for access 4. Re grade and clean disturbed areas $14,000.00 ($3580.20) Total $10,419.80 The credit is for Unit A-1 Line 10 that we charged last pay period that was not supposed to be charged. This price is based on an answer today or first in the morning, because if we leave and come back we will need to include a pump and more man hours to complete the job. Thanks Steve Kenney JDK Associates, Inc. President