Enclaves-CS 950615 (2) MEMORANDUM To: Alan Johnson, Finance Director Via: Ken Griffin, P.E., City Engineer/Assistant City Manager From: Doug Stevens, Eng. Tech RE: Partial Reimbursement of 2% Construction Inspection Fee for Enclaves Date: June 15, 1995 On April 14, 1995, a 2% construction inspection fee for the Enclaves on the Parkway was paid in the amount of $1,911.00. Since that time the contractor has separated the construction costs of the channel to be $48,420.80 developer's cost and $42,387.00 city's cost. Since the council has agreed to reimburse the developer up to $44,688.00, and since the city normally doesn't charge an inspection fee for city funded projects, the contractor and developer has submitted a request for reimbursement in the amoum of $942.58 or 2 % of the $42,387.00. Enclosed please find the letter of request, a copy of the check paid, as well as the journal emry of the finance departmem verifying paymem. The reimbursement should be made to: WPC-Parkway Developmem Corporation, Inc. Operation Accoum 3960 Broadway, Suite 125 Garland, TX 75043 enclosures f:\.., reimburs\enclaves Cook-Jackson, Inc. A '-EGHNIGAL SERVICES GQMPANY June 8, 1995 M r. Doug Stevens Engineering City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Subject: Inspectior, Fees for The Enclaves on the Parkway Dear Doug, Over the past few days I have been ask about the inspection fees that we paid on the Enclaves. Enclosed are copies of the canceled checks for the fees we paid. Based on these checks we have paid the following fees: Contract Amount Fee Paid Excavation $13,500.00 $270.00 Utilities 81,184.55 1,623.69 Paving 87,513.25 1,750.27 Channel Retaining Walls 95,550.00 1,911.00 Wastewater Impact Fee 9,450.00 Water Impact Fee 14,175.00 Park Fee 26,985.00 I have previously submitted the contracts for the excavation, utilities and paving and I am enclosing a copy of the channel wall contract which I have not submitted. When we had the pre-construction meeting for the project we had not finalized our contract for the walls so I used an estimate to calculate the fee. The fee also is based on both sides of the channel. As you know, the east and south sides are to be paid for by the City. During one of our conversations you mentioned that the City would not charge itself an inspection fee; therefore I believe that we are due a reimbursement or credit of $942.58. This is calculated as follows: Original fee basis $95,000.00 $1,911.00 Actual Contract 90,807.80 Less city Portion (Area B) 42,387.00 Developer Portion 48,420.80 968.42 Refund/Credit Due $942.58 P.O. BOX 2728 · DALLAS. TEXAS 75221-2728 · (214) 565-1105 Mr. Doug Stevens The Enclaves on the Parkway Page 2 According to my records, we still owe 8171.99 for street signs mid the erosion control bond or payment. Is it possible to use the channel wall inspection fee refund to offset these outstanding fees, or do you want us to pay these fees separately and you refund us for the overpayment of the channel inspection fee? Doug, please review this and let me know how you want to handle it. I hope to be in a position to final this project next week. Sincerely ~- ~ Keith Jac~__~n enclosures xc: Mr. David Blom -'i EXHI'RIT "A" CONTRACTOR'S PROPOSAL Area A 4,384 sq.fL $9.95/s.f. $43,620.80 Area B 4,260 sq. fl:. 9.95/$.f. 42,387.00 Sidewalk Wall 480 sq. ft. 10.00/s.f. 4,800.00 TOTAL BI~D $90,807.80 Contractor shall provide structural engineering plans to the City of Coppell for approval. · WPO..PARKWAY DEVELC; ENT CORPORATION, INC. I 0 0/-+ QP~RATIN~ ACCOUNT 3~0 BROADWAY, SUITE 125 ~8-123/1119 GARLAND, ~ 75043 _ WPO-PARKWAY DEVELOPMENT CORPORATION, INC. OPFJRAI'ING ACCOUNT 3~0 BROADWAY, SUITE 1~ by__~_~' JOURNAL ED, ::)proyed by POSTED FUND: DATE: "f- ~ '~-¢,',.V' DATE: DESCRIPTION ACCOUNT DR. CR. NUMBER / I - TOTAL