Enclaves-CS 950731 478 t
(~ ;.hoe. BCoixtY478With A Beautiful Future 2,4-462-0022
Coppell, Texas 75019
July 31, 1995
Mr. Joe Don Giles
Giles Construction, Inc.
1721 W. Piano Pkwy., Suite 100
Plano, Texas 75075
RE: Enclaves on the Parkway
Dear Joe:
In accordance with your request, inspection service was provided by the City of Coppell
Engineering Department at the referenced location on Saturday, July 29, 1995. The overtime
rate including salary and benefits is $30.00 per hour. Two hours were charged to your company
on that date.
Please send a check for $60.00 payable to the City of Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Alan Johnson, Finance Director
If you should have any questions, please contact me at (214) 304-3685.
G~a~m~~/' /
Construction Inspector
cc: Doug Stevens, Engineering Technician
Finance Department
file/ovt, ltr
~.ILES MASONRY
21 W. P~.~.o Pj~.KW,~y. Su,~ 100
AN~). TD~ 7S075
~4) ~11-'1941